Mine Safety and Health Administration (MSHA) - Code of Federal Regulations - 30 CFR 7.307
skip navigational linksDepartment of Labor Seal U.S. Department of Labor
Mine Safety and Health Administration
Protecting Miners' Safety and Health Since 1978
Photos representing the mining workforce
 www.msha.gov
Find It! in DOL | Compliance Assistance |    
 
MSHA - Title 30 CFR
30 CFR § 7.307

Static pressure test.

(a) Test procedure. (1) The enclosure shall be internally pressurized to a minimum of 150 psig and the pressure maintained for a minimum of 10 seconds.

(2) Following the pressure hold, the pressure shall be removed and the pressurizing agent removed from the enclosure.

(b) Acceptable performance. (1) The enclosure during pressurization shall not exhibit--

(b)(1) (i) Leakage through welds or casting;or

(b)(1) (ii) Rupture of any part that affects the explosion-proof integrity of the enclosure.

(2) The enclosure following removal of the pressurizing agent shall not exhibit--

(b)(2) (i) Visible cracks in welds;

(b)(2) (ii) Permanent deformation exceeding 0.040 inches per linear foot; or

(b)(2) (iii) Clearances, in excess of those specified in this subpart, along accessible flame-arresting paths, following any necessary retightening of fastenings.

[57 FR 61197, Dec. 23, 1992]




Back to Top   Back to Top www.msha.gov www.dol.gov


Mine Safety and Health Administration (MSHA)
1100 Wilson Boulevard, 21st Floor
Arlington, VA 22209-3939
Phone:    (202) 693-9400
Fax-on-demand: (202) 693-9401
Technical (web) questions: Webmaster
On-line Filing Help: MSHAhelpdesk@dol.gov
or call (877) 778-6055

Contact Us