30 CFR § 20.14
Instructions for handling future changes in lamp design.
All approvals are granted with the understanding that the manufacturer will
make the lamp according to the drawings submitted to MSHA, which have been
considered and included in the approval. Therefore, when the manufacturer
desires to make any change in the design of the lamp, the manufacturer
should first obtain an extension of the original approval to cover the
change. The procedure is as follows:
(a) The manufacturer shall write to the Approval and Certification
Center, RR 1, Box 251, Industrial Park Road, Triadelphia, WV 26059,
requesting an extension of the original approval and describing the change or
changes proposed. With this letter, the manufacturer should submit a revised
drawing or drawings showing the changes in detail, and one of each of the
changed lamp parts.
(a)(1) The manufacturer shall write to the U.S. Department of
Labor, Mine Safety and Health Administration, Approval and
Certification Center, 765 Technology Drive, Triadelphia, WV 26059,
requesting an extension of the original approval and describing the
change or changes proposed.
With this letter the manufacturer should submit a revised drawing or drawings showing
the changes in detail, and one of each of the changed lamp parts.
(2) Where the applicant for approval has used an independent laboratory under part 6 of this chapter to perform, in whole or in part, the necessary testing and evaluation for approval of changes to an approved product under this part, the applicant must provide to MSHA as part of the approval application:
(i) Written evidence of the laboratory's independence and current recognition by a laboratory accrediting organization;
(ii) Complete technical explanation of how the product complies with each requirement in the applicable MSHA product approval requirements;
(iii) Identification of components or features of the product that are critical to the safety of the product; and
(iv) All documentation, including drawings and specifications, as submitted to the independent laboratory by the applicant and as required by this part.
(b) MSHA will consider the application and inspect the drawings and
parts to determine whether it will be necessary to make any tests.
(c) If no tests are necessary, the applicant will be advised of the
acceptance or rejection of the proposed change by letter from MSHA.
(d) If tests are judged necessary, the applicant will be advised of
the material that will be required.
[Sched. 10C, May 17, 1938, as amended by Supp. 1, 20 FR 2719, Apr. 23, 1955;
43 FR 12314, Mar. 24, 1978; 52 FR 17514, May 8, 1987; 60 FR 35692, July 11, 1995; 68 FR 36420, June 17, 2003]
|