30 CFR § 33.12
Changes after certification.
If an applicant desires to change any feature of a certified unit or system,
he shall first obtain MSHA's approval of the change, pursuant to the
following procedure:
(a) Application shall be made as for an original certificate,
requesting that the existing certification be extended to cover the proposed
changes, and shall be accompanied by drawings, specifications, and related
data showing the changes in detail.
(a)(1) Application shall be made as for an original certificate, requesting that the existing certification be extended to cover the proposed changes, and shall be
accompanied by drawings, specifications, and related data showing the changes in
detail.
(2) Where the applicant for approval has used an independent laboratory under part 6 of this chapter to perform, in whole or in part, the necessary testing and evaluation for approval of changes to an approved product under this part, the applicant must provide to MSHA as part of the approval application:
(i) Written evidence of the laboratory's independence and current recognition by a laboratory accrediting organization;
(ii) Complete technical explanation of how the product complies with each requirement in the applicable MSHA product approval requirements;
(iii) Identification of components or features of the product that are critical to the safety of the product; and
(iv) All documentation, including drawings and specifications, as submitted to the independent laboratory by the applicant and as required by this part.
(b) The application will be examined by MSHA to determine whether
inspection and testing will be required. Testing will be necessary if there
is a possibility that the modification may affect adversely the performance
of the unit or system. MSHA will inform the applicant whether such testing is
required and the components or materials to be submitted for that
purpose.
(c) If the proposed modification meets the requirements of this part
and Part 18 of Subchapter D of this chapter (Bureau of
Mines Schedule 2, revised, the current revision of which is Schedule 2F) if
applicable, a formal extension of certification will be issued, accompanied
by a list of new and corrected drawings and specifications to be added to
those already on file as the basis for the extension of certification.
[Schedule 25B, 25 FR 6473, July 9, 1960, as amended at 52 FR 17515, May 8,
1987; 68 FR 36420, June 17, 2003]
|