|
|
A to Z Index |
Find It! in DOL |
[skip navigational links]
Search MSHA's Website
|
***************************************************************** Editorial Note: Based on FedReg. Doc. E8-30639, this section is new. The effective date for this is December 31, 2008. The compliance dates are as follows:
1. § 48.27(a) and §§ 75.156(a), 75.350(b), and 75.1731 by March 2, 2009. 2. § 75.333(c)(4) by March 31, 2009. 3. §§ 75.380(d)(7), 75.380(f), 75.381(e)(5), and 75.381(f) by June 30, 2009. 4. §§ 75.350(a)(2), 75.351(e)(2), 75.1103–4(a), 75.1108(a), and 75.1108(b) December 31, 2009. 5. § 75.1108(c) by December 31, 2018. 6. Each mine operator required to use an atmospheric monitoring system under Sec. 75.350(b) shall comply with the following sections within 60 days after approval of the mine ventilation plan by the district manager. 1. Sec. 75.350(d)(1), 2. Sec. 75.351(e)(1)(iii), 3. Sec. 75.351(e)(1)(iv), and 4. Sec. 75.352(g). 30 CFR § 75.156
AMS operator, qualifications.
|
|
|
www.msha.gov | www.dol.gov |
|
| ||
|---|---|---|
|
| ||
|
Mine Safety and Health Administration (MSHA) 1100 Wilson Boulevard, 21st Floor Arlington, VA 22209-3939 |
Phone:
(202) 693-9400 Fax-on-demand: (202) 693-9401 Technical (web) questions: Webmaster On-line Filing Help: MSHAhelpdesk@dol.gov or call (877) 778-6055 Contact Us | |