| Appendix A | List of Deceased and Injured Miners |
| Appendix B | Detailed Map of Mine |
| Appendix C | Mine Rescue Personnel and Teams Responding |
| Appendix D | BCMR Air Quality Measurements Taken On January 2 and 3, 2006 |
| Appendix E | Gas Chromatograph Analysis Results for the No. 1 Drift Opening and Borehole No. 1 |
| Appendix F | Accident Investigation Data - Victim Information |
| Appendix G | Lists of Individuals Who Assisted with the Investigation |
| Appendix H-1 | Mapping of the Entire Mine |
| Appendix H-2 | Mapping of the Entire Mine |
| Appendix H-3 | Mapping of the Entire Mine |
| Appendix H-4 | Mapping of the Entire Mine |
| Appendix H-5 | Mapping of the Entire Mine |
| Appendix H-6 | Mapping of the Entire Mine |
| Appendix H-7 | Mapping of the Entire Mine |
| Appendix H-8 | Mapping of the Entire Mine |
| Appendix H-9 | Mapping of the Entire Mine |
| Appendix I | Executive Summary of "Investigation of Pyott-Boone Electronics MineBoss Monitoring and Control System" |
| Appendix J | Bottom Mining Supplements to the Ventilation Plan |
| Appendix K | Three Supplements to the Ventilation Plan Concerning Omega Block Seals |
| Appendix L | Pre-Explosion Simulation of the Mine Ventilation System |
| Appendix M | Post-Explosion Simulation of the Mine Ventilation System with the Damaged Ventilation Controls |
| Appendix N | Post-Explosion Simulation of the Mine Ventilation System with the Initial Repairs made to the Damaged Ventilation Controls |
| Appendix O | Evaluation of Potential for a Roof Fall to Ignite a Methane-Air Mixture |
| Appendix P | An Evaluation of Features & Description of Features Observed Inby Spad 4010 |
| Appendix Q | Results of the Mine Dust Survey |
| Appendix R | Map Showing the Location of all Intended Mine Dust Sample Locations and Results |
| Appendix S | Executive Summary of Inspection of Sago Mine Voice Communications Equipment |
| Appendix T | Executive Summary of the Trolleyphone Repeater Report |
| Appendix U | An Executive Summary of Investigation of the Motorola Two-way Radios |
| Appendix V | Executive Summary of the Evaluation of the Uniaxial Compressive Strength of Burrell "Omega" Blocks |
| Appendix W | Sampling and Testing of Mortar Bed Cores Taken from Failed Ventilation Seals |
| Appendix X | Experimental Study of the Effect of LLEM Explosions on Various Seals and Other Structures and Objects |
| Appendix Y-1 | Map of the Electrical System, Equipment, and Associated Items |
| Appendix Y-2 | Map of the Electrical System, Equipment, and Associated Items |
| Appendix Z | Executive Summary of Portable Gas Detector Testing |
| Appendix AA | Vaisala Group and AWS Convergence Technologies, Inc. Reports |
| Appendix BB | Map Showing Sago Mine in Relation to Recorded Location of Lightning Strikes, a Lightning Damaged Poplar Tree and the Mine's Phone and Power Lines |
| Appendix CC | Results from Analysis of Seismic Data |
| Appendix DD | Measurements and Modeling of Transfer Functions for Lightning Coupling into the Sago Mine |
| Appendix EE | Report on the Investigation of the Well Heads and Gas Pipeline System |
| Appendix FF | Geophysical Survey of the Old 2 Left Section of the Sago Mine |
| Appendix GG | Map Showing Sago Mine in Relation to Recorded Locations of Lightning Strikes, Gas Wells and Gas Lines |
| Appendix HH | Observation and Sampling Collection Methodology |
| Appendix II | Executive Summary of Submersible Pump Parts Recovered from Sago Mine |
| Appendix JJ | Sago Mine Pump Cable Test |
| Appendix KK | Map Showing Earth Resistance Measurement Values |
| Appendix LL | Mine Map Detailing the Extent of Flame and the Direction of the Primary Explosion Forces |