Skip to content

Petition for Modification

In the matter of
Buck Mountain Coal Co.
Buck Mtn. Slope
I.D. No. 36-01962
Docket No. M-2002-063-C
30 CFR 75.1100-2(a)(2)

PROPOSED DECISION AND ORDER

On July 26, 2002, a petition was filed seeking a modification of the application of 30 CFR 75.1100-2(a)(2) to Petitioner's Buck Mtn. Slope, located in Schuylkill County, Pennsylvania. The Petitioner alleges that the alternative method outlined in the petition will at all times guarantee no less than the same measure of protection afforded by the standard.

MSHA personnel conducted an investigation of the petition and filed a report of their findings and recommendations with the Administrator for Coal Mine Safety and Health. After a careful review of the entire record, including the petition and MSHA's investigative report, this Proposed Decision and Order is issued.

Finding of Fact and Conclusion of Law

MSHA's review of the petition, investigation report, and discussions with mine operators, reveal that because of the low volatile nature of anthracite coal, anthracite coal dust does not propagate an explosion. Additionally, the ignition temperature of anthracite coal is high which makes it harder to ignite. Furthermore, atmospheric conditions in this mine is generally wet with water dripping from the roof. The investigation report revealed that electric face equipment is not used in this mine. Therefore, it is determined that the alternative method proposed by the Petitioner will at all times guarantee no less than the same measure of protection afforded the miners under 30 CFR 75.1100-2(a)(2).

On the basis of the petition and the findings of MSHA's investigation, as well as MSHA's recommendations, Buck Mountain Coal Company's modification of the application of 30 CFR 75.1100-2(a)(2) to its Buck Mtn. Slope is granted.

ORDER

Wherefore, pursuant to the authority delegated by the Secretary of Labor to the Administrator for Coal Mine Safety and Health, and pursuant to Section 101(c) of the Federal Mine Safety and Health Act of 1977, 30 U.S.C., Section 811(c), it is ordered that Buck Mountain Coal Company' Petition for Modification of the application of 30 CFR 75.1100-2(a)(2) in the Buck Mtn. Slope is hereby:

GRANTED, for firefighting equipment in the working section, conditioned upon compliance with the following terms and conditions: Any party to this action desiring a hearing on this matter must file in accordance with 30 CFR 44.14, within 30 days. The request for hearing must be filed with the Administrator for Coal Mine Safety and Health, 1100 Wilson Boulevard, Arlington, Virginia 22209.

If a hearing is requested, the request shall contain a concise summary of position on the issues of fact or law desired to be raised by the party requesting the hearing, including specific objections to the proposed decision. A party other than the Petitioner who has requested a hearing shall also comment upon all issues of fact or law presented in the petition, and any party to this action requesting a hearing may indicate a desired hearing site. If no request for a hearing is filed within 30 days after service thereof, the Decision and Order will become final and must be posted by the operator on the mine bulletin board at the mine.

_________________________________________

John Langton
Acting Deputy Administrator
for Coal Mine Safety and Health