Petition for Modification


In the Matter of
H & M Coal Contracting
Rocky Top Mine
I.D. No. 36-09072
Docket No. M-2002-120-C
30 CFR 75.1100-2(a)(2)

PROPOSED DECISION AND ORDER


On December 4, 2002, a petition was filed seeking a modification of the application of 30 CFR 75.1100-2(a)(2) to Petitioner's Rocky Top Mine, located in Williamstown, Schuylkill County, Pennsylvania. The Petitioner alleges that the alternative method outlined in the petition will at all times guarantee no less than the same measure of protection afforded by the standard.

MSHA personnel conducted an investigation of the petition and filed a report of their findings and recommendations with the Administrator for Coal Mine Safety and Health. After a careful review of the entire record, including the petition and MSHA's investigative report and recommendation, this Proposed Decision and Order is issued.

Finding of Fact and Conclusion of Law


MSHA's review of the petition, investigation report, and discussions with mine operators, reveal that because of the low volatile ratio of anthracite coal, anthracite coal dust does not propagate an explosion. Additionally, the ignition temperature of anthracite coal is high which makes it harder to ignite. Furthermore, conditions in these mines are generally wet. Moreover, the investigation report reveals that electric face equipment is not used in this mine. Therefore, it is determined that the alternative method proposed by the Petitioner will at all times guarantee no less than the same measure of protection afforded the miners under 30 CFR 75.1100-2(a)(2).

On the basis of the petition and the findings of MSHA's investigation, H & M Coal Contracting, is granted a modification of the application of 30 CFR 75.1100-2(a)(2) to its Rocky Top Mine.

ORDER


Wherefore, pursuant to the authority delegated by the Secretary of Labor to the Administrator for Coal Mine Safety and Health, and pursuant to Section 101(c) of the Federal Mine Safety and Health Act of 1977, 30 U.S.C., sec. 811(c), it is ordered that H & M Coal Contracting's Petition for Modification of the application of 30 CFR 75.1100-2(a)(2) in the Rocky Top Mine is hereby:

GRANTED, for firefighting equipment in the working section, conditioned upon compliance with the following terms and conditions:

Any party to this action desiring a hearing on this matter must file in accordance with 30 CFR 44.14, within 30 days. The request for hearing must be filed with the Administrator for Coal Mine Safety and Health, 1100 Wilson Boulevard, Arlington, Virginia 22209-3939.

If a hearing is requested, the request shall contain a concise summary of position on the issues of fact or law desired to be raised by the party requesting the hearing, including specific objections to the proposed decision. A party other than the Petitioner who has requested a hearing shall also comment upon all issues of fact or law presented in the petition, and any party to this action requesting a hearing may indicate a desired hearing site. If no request for a hearing is filed within 30 days after service thereof, the Decision and Order will become final and must be posted by the operator on the mine bulletin board at the mine.

_________________________________

John F. Langton
Acting Deputy Administrator
for Coal Mine Safety and Health