Skip to content

PIB09-01 Potential Safety Hazard on J. H. Fletcher & Co. Roof Bolting Machines with Independent Left and Right Tram Levers - 01/06/2009
PIB09-03 General Guidelines for the Use of Numerical Modeling to Evaluate Ground Control Aspects of Proposed Coal Mining Plans - 03/16/2009
PIB09-04 AMS Operator Training Guide and Part 48 Task Training Addendum - 03/03/2009
PIB09-05 Part 100 Safety and Health Conference Procedures - 03/27/2009
PIB09-07 Neutral Start Methods on Mobile Electrical Equipment - 04/16/2009
PIB09-08 Methane Ignitions at Surface Highwall Auger Operations - 05/22/2009
PIB09-09 Re-Issue P07-04 - Clarification of Requirements of Title 30 Code of Federal Regulations §57.11050 Escapeways and refuges - 06/04/2009
PIB09-10 Re-Issue of P00-11 - Nondestructive Testing of Wire Rope -Electromagnetic Testing - 06/05/2009
PIB09-13 Re-Issue P04-06 - Hazards Associated with Surface Mines Intersecting Abandoned or Underground Workings - 07/17/2009
PIB09-14 Re-Issue P06-01 - Compliance with the Testing and Maintenance Requirements of 30 C.F.R. 75.1911(i), Fire Suppression Systems for Diesel-Powered Equipment and Fuel Transportation Units. - 07/17/2009
PIB09-18 Re-Issue of P02-06 - Retrofit Program for Isuzu C240MA Diesel Engines - 07/22/2009
PIB09-20 Re-Issue P97-24 - Portable Methane Detectors Magnetically Attached to Mining Machinery (The "Gizmo") - 07/31/2009
PIB09-21 Re-Issue P04-03 - Retrofit Program for Caterpillar Model 3306 PCNA Diesel Engines under Approval Numbers 7E-A002 and 7E-B003 - 07/31/2009
PIB09-33 Effects of PVC Cement Vapors on Handheld Gas Detectors
PIB09-36 Re-Issue of P05-05 - Use of Magnets near Remote Control Operated Equipment
PIB09-39 Reissue of P03-24 - How to Change Your Address with MSHA or Request Certain Publications
PIB09-40 CSE SR-MP Expectations Training Unit
PIB09-42 Audits on Permissible Underground Mining Equipment
Some or all of the files available on this page are PDF. For more information on PDF, PDF readers and accessibility issues, please use this link.