| # of Viols. |
Percent * |
Standard and Title |
Compliance Tips |
| 5,591 |
12.58% |
75.400 Accumulation of Combustible Materials |
|
| 2,603 |
5.86% |
75.503 Permissible Electric Face Equipment; Maintenance |
|
| 2,407 |
5.42% |
75.370(a)(1) Mine Ventilation Plan; Submission and Approval |
|
| 1,652 |
3.72% |
75.202(a) Protection from Falls of Roof, Face and Ribs |
Get Tip |
| 1,340 |
3.01% |
75.220(a)(1) Roof Control Plan |
|
| 1,073 |
2.41% |
75.517 Power Wires and Cables; Insulation and Protection |
|
| 824 |
1.85% |
75.512 Electric Equipment; Examination, Testing and Maintenance |
|
| 808 |
1.82% |
75.1725(a) Machinery and Equipment; Operation and Maintenance |
|
| 709 |
1.60% |
75.403 Maintenance of Incombustible Content of Rock Dust |
|
| 701 |
1.58% |
75.1722(a) Mechanical Equipment Guards |
Get Tip |
| 579 |
1.30% |
75.1403 Other Safeguards |
|
| 528 |
1.19% |
75.604(b) Permanent Splicing of Trailing Cables |
|
| 497 |
1.12% |
75.1100-3 Condition and Examination of Firefighting Equipment |
Get Tip |
| 448 |
1.01% |
77.1104 Accumulations of Combustible Materials |
|
| 384 |
0.86% |
75.333(h) Ventilation Controls |
|
| 373 |
0.84% |
75.807 Installation of High-voltage Transmission Cables |
|
| 332 |
0.75% |
77.404(a) Machinery and equipment; operation and maintenance |
|
| 317 |
0.71% |
75.342(a)(4) Methane Monitors |
|
| 277 |
0.62% |
75.606 Protection of trailing cables |
|