Most Frequently Cited Standards for 2005
![]() |
|---|
|
Surface Coal
01/01/2005 - 12/31/2005 Statistics were compiled April 21, 2006 |
| # of Viols. | Percent * | Standard and Title | Compliance Tips |
|---|---|---|---|
| 1,455 | 17.3% |
77.404(a) Machinery and Equipment; Operation and Maintenance |
|
| 599 | 7.1% |
77.1605(d) Loading and Haulage Equipment; Installations |
|
| 529 | 6.3% |
77.1104 Accumulations of Combustible Materials |
|
| 474 | 5.6% |
77.410(c) Mobile Equipment; Automatic Warning Devices |
|
| 405 | 4.8% |
77.1606(c) Loading and Haulage Equipment; Inspection and Maintenance |
|
| 326 | 3.9% |
77.1110 Examination and Maintenance of Firefighting Equipment |
|
| 260 | 3.1% |
77.1605(b) Loading and Haulage Equipment; Installations |
|
| 240 | 2.9% |
77.502 Electric Equipment; Examination, Testing, and Maintenance |
|
| 237 | 2.8% |
77.400(a) Mechanical Equipment Guards |
|
| 177 | 2.1% |
77.1109(c)(1) Quantity and Location of Firefighting Equipment |
|
| 170 | 2.0% |
77.410(a)(1) Mobile Equipment; Automatic Warning Devices |
|
| 161 | 1.9% |
77.1605(a) Loading and Haulage Equipment; Installations |
|
| 152 | 1.8% |
77.1605(k) Loading and Haulage Equipment; Installations |
|
| 149 | 1.8% |
72.620 Drill Dust Control at Surface Mines and Surface Areas of Underground Mines |
|
| 102 | 1.2% |
71.208(a) Bimonthly Sampling; Designated Work Positions |
|
| 94 | 1.1% |
77.1606(a) Loading and Haulage Equipment; Inspection and Maintenance |
|
| 87 | 1.0% |
77.1000 Highwalls, Pits, and Spoil Banks; Plans |
|
| 73 | .88% |
77.205(a) Travelways at Surface Installations |
|
| 71 | .84% |
77.205(b) Travelways at Surface Installations |
|
| 70 | .83% |
77.202 Dust Accumulations in Surface Installations |


