Joy 14CM RC Continuous Mining Machine with attached mobile bridge haulage
Duty 1:  Start-of-Shift Activities Duty 2:  Hot Seating (1st to 2nd shift) Duty 3:  Starting Fresh (Day shift) Duty 4:  Conducting Dust Parameter Exam Duty 5:  Pre-op Continuous Miner Duty 6:  Tramming/Moving Miner Duty 7:  Cutting coal Duty 8:  Turn crosscut to the right (Belt to R1 and L2) Duty 9:  Turn crosscut to the left  (Belt to L1 and R2) Duty 10:  Belt-up Duty 11:  Normal End-of-Shift Activities (Hot-seating) Duty 12:  End-of-Shift (Saturday) Duty 13:  Remote Box Functions Duty 14:  Using the Gizmo Duty 15:  Installing sight lines Duty 16:  Non-Routine Tasks/Unusual Activities
1. Duty 1: Start-of-Shift Activities
Change clothes
Get CSE SR-100 Priority 3
Check indicators Priority 3
Check seal and dents Priority 3
Remove from pouch monthly Priority 3
Check in/Tag in
Obtain PPE Priority 2
Gloves
Safety glasses
Hearing protection
Safety boots
Respirator
Reflective material on clothing
Hard hat
Get detector Priority 2
Check battery Priority 2
Zero out Priority 2
Get cap lamp with accessory receptacle Priority 2
Check charger
On fully charged lamp, gauge will be off
Get streamers
Meet with foreman
Obtain work assignments
Discuss bolted/unbolted areas
Discuss planned belt-ups
Enter the mine
Conduct pre-op on mantrip Priority 3
The miner operator normally operates the mantrip
Check lights
Ensure horn works
Check foot pedal brake Priority 3
Check parking/emergency brake Priority 3
Check fire extinguisher
Get rock bar, pump jack, and handle
Check tires
Check travel way conditions
Always examine work area and work place for hazards
Get on mantrip
Put on safety glasses before mantrip moves Priority 2
Tram mantrip to face
Use dynamic brake when going downgrade
Travel at speed consistent with roadway conditions
Park out of the way
Set emergency brake
Turn power switch off
2. Duty 2: Hot Seating (1st to 2nd shift)
Check travelway conditions
Always examine work area and work place for hazards
Talk to other continuous miner operator
Discuss condition of machine
Discuss problems with remote, shutdown switch, etc.
Discuss time frame for gas tests, if necessary
Discuss roof conditions
Discuss changes in bottom
soft, wet, broken up
Examine roof and rib Priority 2
Look for check curtains
Put red streamers up
Place on 2nd row back, place on each side of miner, no one may go past streamers when miner is in cutting cycle
Check for unsupported roof signs Priority 2
One should be placed behind the curtain
Placed at all approaches to unsupported areas
3. Duty 3: Starting Fresh (Day shift)
Check work area conditions
Always examine work area and work place for hazards
Talk to mechanic on section
Discuss water pressure
25 psi minimum
Discuss sprays
17 sprays minimum per plan
Discuss bits
Discuss scrubber ductwork and screen cleanliness
Discuss whether or not sump has been flushed
This is part of the required dust parameters examination
The mechanic will do these for you when possible
Talk with foreman
Discuss mining sequence
Discuss any problems observed
Discuss air readings and cut depths
2 cut sequence
4 cut sequence
Obtain clearance to tram into the face
Confirm methane exam has been made
This is part of the required dust parameter examination
Tram miner to face
Allow for foreman to take scrubber reading
Inform bridge crew where you are going and that you are starting up
Position yourself behind the miner in crosscut if at all possible Priority 3
Stay out of miner red zones
Discuss Red Zones for CM and haulage
Position yourself in a crosscut ahead of the miner until it passes Priority 3
Stay out of miner red zones
Discuss Red Zones for CM and haulage
Start mining
4. Duty 4: Conducting Dust Parameter Exam
Check work area conditions
Always examine work area and work place for hazards
De-energize miner Priority 3
Put water pressure gage on right side of miner near bull wheels
Energize machine
Activate water sprays with remote
Count how many sprays are in operating condition
17 operating sprays minimum
No more than one blocked spray in each spray bar
Check scrubber sprays
Not part of the 17 - a minimum of two must be in operating condition at all times