Skip to content
Duty 8: Install Pressure Line Conduct exam Obtain and examine tools and materials Chisel Hammer Anti-seize Wire brush Rags Ladies slipper Punch Screw driver 2" super staples Obtain lo-trac with super stecko hoses Loop over forks Start at the water board Remove two hoses from the lo-trac Tram in 50' and take two more hoses off Continue until all super stecko hoses are spotted Connect super stecko hoses Unroll hose Place into trolley carrier in inside trays See diagram Clean coupler and lubricate Push male end of hose into female coupler starting at water board and working inby Install super staples CAUTION:  This line will carry up to 5000 psi Continue this process until you reach the last trolley Remove all debris and materials Duty 9:  Install 2" JIC Hoses Conduct exam Obtain and examine tools and materials Hammer Anti-seize Wire brush Rags 2 -18" Pipe wrenches Obtain 2" JIC hoses and place at headgate in the belt entry Place the lo-trac outby the hoses Unroll two hoses and hook the male end to lo-trac with a nylon sling rope/pull Pull the lo-trac forward 50' Clean connectors as needed and lubricate Connect the next two sections of JIC hoses with pipe wrenches These fittings must be tight to prevent leaks Pull the lo-trac forward 50' Repeat this process until you reach the water board Connect hose to water board Place into trolley tray, one JIC hose over each super stecko hose See diagram for placement of hoses Repeat this process for the fresh water line.  The fresh water line is also 2" JIC.  Hook female end of hose to lo-trac Place fresh water line in the trolley tray opposite the belt See diagram Identify the hose that will be used for fresh water/fire outlets by marking couplings Install fire outlets every 300 feet from the water board on the fresh water line See diagram Remove all debris and materials Duty 10:  Install High Voltage Cables Conduct exam Obtain and examine tools and materials Pull rope Lo-trac Electra-clean Wire brush Spanner wrench Rags Allen wrenches Snap ring tool Remove cable car from track utilizing the duck bill scoop Be sure the duck bill has had a pre-op exam See JSA on scoop Tram duck bill scoop with car to the headgate area Lower car to the bottom Place lo-trac outby cable car in belt entry Pull enough cable off the car by hand to hook to the lo-trac with tie down strap or pull rope Cable will have cat head with cover Position someone to stay at the car Pull high voltage cable with the lo-trac to the AB distribution box Ensure high voltage cables are shielded for the entire length Place cable in the belt side of the trolley tray See diagram Lifting the cable requires multiple people Leave enough cable slack to enter into AB distribution box Use good lifting techniques Connect cable plug to AB distribution box Remove both covers Clean the plug with Electra-clean Wipe down with clean rag Line the ground and the ground monitor prongs on the cat head with the receptacle on AB distribution box  Screw the plug onto the AB distribution box Install restraining clamps Install lead seal wire Repeat this process for the next high voltage cable Store excess slack of cables on the belt line until 8-bay box is in place Remove all debris and materials Duty 11:  Install No. 6 Cable Conduct exam Obtain and examine tools and materials Rags Screw driver Come-a-long Crimper tool Wire cutters Utility knife Splice kit Pull strap/rope Utilizing the lo-trac, pick up spool of cable from the track entry Take spool of cable into the headgate area Install come-a-long from monorail hanger Move the lo-trac into the belt entry Utilizing the come-a-long, pick the spool of cable off the bottom Unreel enough slack by hand to hook No. 6 cable to lo-trac with sling/rope Pull cable toward AB distribution box leaving enough slack to reach the power center, approximately 100' Use "ENERGY CONTROL PLAN" Install 575 cat head at the power center Ensure cable is in conduit entering cat head Label the cat head Install frame ground straps Follow the same procedure to pull the second spool of cable to meet the first Splice cable as needed Place cable in tray along with high voltage cable Excess slack store on the belt line Use same procedure to pull the data cable Install the data cable under the tray with double insulated tie straps This cable must not touch the monorail frame This cable must extend to the Minnie master Lay the excess on the belt Remove all debris and materials Duty 12:  Install Push Pull on Monorail (Crab) Conduct SPSA exam Obtain and examine tools and materials Hammer Rags Ladies slipper Punch Screw driver Obtain the crab from the track entry with the lo-trac on the pallet If not on pallet, put on a pallet and set it up with the stinger facing outby Add one section of monorail See Monorail Set Up (Duty No. 5) Position the crab at the inby end of the monorail Raise the crab with the lo-trac Align the arms of the crab to fit the monorail Tram forward with the lo-trac until the arms of the crab are engaged in the monorail Install push bar on outby end of crab to last trolley using push pins Add a section of monorail inby the crab See Monorail Set Up (Duty No. 5) Slide two trolleys onto the just installed monorail Push the outby trolley toward the crab close enough to install a push bar Obtain monorail booster pump with lo-trac Align the booster pump with the monorail with the intake port pointing outby Move the pump outby until the rear support can be raised and pinned into the trolley with the inby crab push bar Raise the pump Align the hole in the center of the trolley with the hole in the pump carrier Install the pin Raise the front of pump Align the trolley previously installed Install the pin Remove all debris and materials Duty 13:  Install Booster Pump, Welder, Air Compressor, and 8 Bay Conduct exam Obtain and examine tools and materials Hammer Rags Ladies slipper Punch Screw driver All chains used on the longwall will be Grade 8 strength Install booster pump Obtain monorail booster pump with lo-trac Align the booster pump with the monorail with the intake port pointing outby Move the pump outby until the rear support can be raised and pinned into the trolley with the inby crab push bar Raise the pump Align the hole in the center of the trolley with the hole in the pump carrier Install the pin Raise the front of pump Align the trolley previously installed Install the pin Install welder Add one section on monorail Obtain welder with lo-trac from track entry Align welder hanging eye under monorail Move trolley to align with hanging eye Raise welder Install pin through hanging eye and trolley Lower mast of lo-trac Install one trolley and stiff arm Install compressor Add one section on monorail Obtain compressor with lo-trac from track entry Align compressor hanging eye under monorail Move trolley to align with hanging eye Raise compressor Install pin through hanging eye and trolley Lower mast of lo-trac Install one trolley and stiff arm Install 8 Bay Add monorail through crosscut Install three special trolleys Obtain 8 Bay with duck bill scoop Load onto duck bill diagonally with controls facing operator Must have ground man with duck bill operator Secure the 8 Bay with duck bill winch rope Tram to the headgate area Will have to adjust 8 Bay on the duck bill to align with trolley See diagram Turn to left Set 8 Bay down Shift the blade under the 8 Bay by turning the scoop to the right to center the load Align the 8 Bay with the monorail trolleys CAUTION:  Only one person should direct the operator.   Scoop operator must be aware at all time.  Scoop operator must set brake and shut scoop down prior to installing the pin Raise 8 Bay Insert pin Align 8 Bay with monorail and trolleys Raise 8 Bay Insert a pin in each hanging eye and trolley Push the 8 Bay with the duck bill scoop to within 5' of the welder Install the 5' push bar between the 8 Bay and the compressor Finish the monorail Install seven wider trolleys Attach first trolley to the 8 Bay using a 60" push bar Attach a 12-foot 3/8" chain between first and second trolley inby the 8 Bay Connect the five remaining trolleys with 60" push bars between them Lay hoses that has been stored on the belt line in the trolley trays Strap the cables and hoses in place in their trays on each side of the trolley Each trolley takes eight straps Install straps on cables and hoses between the trolleys, one in the center of the span and one on each end about a foot from the trolley This takes six straps Remove all debris and materials