Duty 14:  Install Headgate Drive Conduct exam Obtain and examine tools and materials Chisel Hammer Anti-seize Wire brush Rags Ladies slipper Punch Screw driver Crib blocks 3/4" socket set 3/4" drive air impact 3/4" metric Allen sockets 1" wire rope slings (25 and 35 feet) Rock bars Obtain headgate drive from the track entry with duck bill scoop and tram to headgate entry Load with shield side toward operator This task requires a ground man Secure the drive with scoop winch rope Obtain four crib blocks Align headgate drive with walkway side of stageloader on center line of belt entry and with the face side 2' inby the longwall face See diagram Place crib blocks under drive at all four corners Lower the drive onto the crib blocks Back the duck bill scoop out Remove sprocket access door from headgate Remove the six Allen socket  head bolts with the 19mm wrench Lift and remove the door with lo-trac Place door against rib Push 35' sling through the access door opening under the sprocket until you see the end of the cable on the opposite side of the headgate drive CAUTION:  No standing between pan line joints when scoop is operating Remove all debris and material Duty 15: Install Headgate Specials Conduct exam Obtain and examine tools and materials Chisel Hammer Anti-seize Wire brush Rags Ladies slipper Punch Screw driver Crib blocks 3/4" socket set 3/4" drive air impact 3/4" metric Allen sockets 1" wire rope slings (25 and 35 feet) Rock bars Install grade pan Obtain grade pan and tram to face Place the handrail on the off side of duck bill scoop operator This task requires a ground man Position the pan line on the duck bill scoop so that the operator can see the sigma on the face side of the pan Secure the pan line on the duck bill scoop with winch rope Align pan line and install four dog bones See diagram/photo(s) Use sigma as a guide to align the pan line with the sigma on the headgate drive Pull cable sling until the eye is at the headgate sprocket access door Obtain a box of face conveyor chain with the duck bill scoop Secure the chain box with the winch cable Place the box of chain directly in front of sprocket access door E-bolts must be up so when the chain is pulled in bottom of pan line the flight is upside down You may have to turn box Attach 35' sling cable to the first links of face conveyor chain using connecting links Tram the duck bill scoop to the last pan installed Hook the 35' sling cable to the duck bill scoop Pull until the connecting links are at the end of the last installed pan Pull the sling cable up into the grade pan for storage while still hooked to the connecting links See photo(s) Set headgate special pans Tram to the pan line storage area Load two pans on the duck bill scoop Position the pan line on the duck bill scoop so that the operator can see the sigma on the spill pan side Use sigma as a guide to align the pan line with the sigma on the grade pan Tram back to pan line Align pan Stop 2' away from pan Lower pan to bottom Turn duck bill scoop off Push 35' cable through pan line and flap back over toward headgate Have ground man keep tension on the sling pulling slack back as pans are put into place Pick up pan Push pan into final position Shut duck bill scoop off Install the two dumb bells and keeper and one accu-trac pin and keeper Repeat this process to the headgate side of the notch in face Remove all debris and materials Duty 16:  Install Shearer Conduct exam Obtain and examine tools and materials Chisel Hammer Anti-seize Wire brush Rags Ladies slipper Punch Screw driver Crib blocks 3/4" socket set 3/4" drive air impact 3/4" metric Allen sockets Rock bars 2 Duck bill scoops Torches Spotter Burning permit Rock dust Fire Extinguisher Cutting goggles Welding gloves Striker Torque multiplier Hand cleaner/spray silicon Lubricant Obtain shearer from the track with duck bill scoop Position two duck bill scoops, one on each side of track, with the bills facing the track Instruct the motorman to position the shearer so that the end of the shearer is even with the outby corner of the crosscut Set torches up See cutting and welding plan Cut shearer free of transport car Place duck bill under the shearer trapping shoe and sprocket near the outby end When this shearer is being unloaded, the control panel covers must be on the inby side when taken to the face Instruct the motorman to tram toward scoop at the same time the scoop will tram into the crosscut This will swing the shearer to the position for transport Stop the motorman and scoop operator when the shearer is parallel with crosscut  Place the duck bill of the second scoop under the trapping shoe and sprocket on the opposite end When this shearer is being unloaded, the control panel covers must be on the inby side when taken to the face Lift shearer off the car with both scoops Secure the shearer body with scoop winch rope Instruct motorman to transport car from under the shearer Tram scoops with the shearer to pan line, push the shearer and lead scoop with the trailing scoop These two operators have to work together Communication between the two operators is critical The lead scoop is only to assist as needed Stop at notch Shut scoops down Crib the headgate end of the shearer with six crib blocks about 18" off the bottom Lower the shearer on to the cribbing Unhook the scoop winch line Install ranging arms, cutter drum, and water spider See Duty No. 17 Install shearer on pan line Install piece of accu-trac onto the existing pan line leaving one end loose This is to be use as a guide pin Set duck bill scoops One scoop on the headgate end One scoop on the tailgate end of shearer Lift the headgate end of the shearer off the bottom Tram the scoop forward toward the head drive until the trapping shoe is aligned with accu-trac You may have to lower or raise the scoop to engage the trapping shoe onto the accu-trac Use tailgate scoop to push the entire shearer toward the headgate engaging the trapping shoe on both ends You may have to lower or raise the scoop to engage the trapping shoe onto the accu-trac Install tailgate ranging arm, cutter drum, and water spider See Duty No. 17 Remove all debris and materials Duty 17:  Install Ranging Arms, Headgate Cutter Drum, and Water Spider Conduct exam Obtain and examine tools and materials Chisel Hammer Anti-seize Wire brush Rags Ladies slipper Punch Screw driver Crib blocks 3/4" socket set 3/4" drive air impact 3/4" metric Allen sockets Rock bars 2 Duck bill scoops Torches Spotter Burning permit Rock dust Fire Extinguisher Cutting goggles Welding gloves Striker Torque multiplier Hand cleaner/spray silicon/lubricant Come-a-long Tacky stuff Install ranging arms Tram the scoop back to the notch and pick up the headgate ranging arm Position the ranging arm so that the cutter drum hub is toward the operator and cutter motor facing the scoop operator's side Tram the scoop with the ranging arm back to the shearer body Remove the ranging arm pins Align arm into position Raise arm into position with scoop Ground man will instruct scoop operator as needed CAUTION:  Ground man must stay clear of ranging arm and scoop until arm is in position and scoop is shut down Install pins and keepers Follow the manufacturer's guidelines If you do not have the manufacturer's guidelines, do not install the keepers Install pin in shearer jack Raise or lower with scoop for adjustment Insert pin Bolt keeper plate to ranging arm Install headgate cutter drum Obtain headgate cutter drum from notch with scoop Attach winch cable to the hanging eye on the drum Pull drum with the winch cable so that it is standing with the shallow side toward the face and comes in contact with the front of the duck bill and wedges itself Tram headgate cutter drum to ranging arm Align drum with shaft Use the duck bill to maneuver the drum onto the shaft Release the winch cable Install starter pull bolts through the drum into the drive until drum is flush Remove starter bolts, one at a time Replace with drum bolts Torque drum bolts to 1200 foot pounds Use torque multiplier Install water spider Obtain water spider with duck bill scoop Obtain O-rings Two large and four small Tram scoop with spider to headgate ranging arm Install large O-rings on water manifold on ranging arm Lubricate O-rings with hand cleaner Install small O-rings in spider Hold in place with something tacky Install two 19mm all thread about 18' long into the drum Lift with come-a-long Loop come-a-long chain through bit holder Loop a chain through the spider Lift into place Slide onto 19mm all thread guide bolts  Slide in as far as possible Install nuts onto the guide bolts then remove come-a-long Draw spider into place using the guide bolt nuts Install spider mounting bolts Remove guide bolts Torque to manufacturer's specification Repeat this process for the tailgate ranging arm, drum, and spider after the shearer is on the pan line Remove all debris and materials