Roof Bolter Operator
Contact:
Palmer.Melvin@dol.gov
Home
1. Start-of-Shift Activities
Self evaluation
Check in/Tag in
Change clothes
Get W-65
Get CSE SR-100
Obtain PPE
Get spotter
Obtain tools
Obtain supplies
Meet with foreman
Enter the mine
2. Arrive at workplace
Exit mantrip
Conduct work place examination
Conduct work place examination
3. Conduct dust parameter exam
Energize machine
Check dust boxes
Check water boxes
Check suction on drill head
Check cut ventilation
Report completion of exam to f...
4. Pre-op on Roof Bolter
Ensure everyone is clear of th...
Check fire suppression
Check panic strip
Check operational controls
Check Tram controls
Check lights
Check bolts/pins on canopies
Check slate bar
Check grease gun
Check for probe
Check for torque wrench
Check for pre-op sticker
Look for hydraulic fluid leaks
5. Untitled
Tramming
6. Drill test holes
Drill test hole at least 1 foo...
Watch for steel to jump
Look, listen, and feel for cha...
Measure test hole
Mark test hole
Determine the length of bolts
7. Drilling and installing roof b...
Advance bolter 4 foot from la...
Set ATRS
Swing booms out no more than 4...
Set foot jack
Set canopy
Examine roof
Place starter steel in drill p...
Raise boom, put steel against ...
Drop boom and add pusher to fi...
Get resin
Get bolt and plate
Insert resin into hole
Insert bolt with plate
Push bolt up with boom within ...
Rotate 3 to 8 seconds
Push bolt and plate against ro...
Hold until resin sets up
Drop boom
Swing boom in 4 to 5 feet
Repeat drilling process
Torque first and third bolt on...
Torque second and fourth bolt ...
Make gas test with probe
Advance line curtain as boltin...
Bolt as close to face as possi...
Place reflectors/streamers on ...
Clean dust box every second cu...
8. Service roof bolter
Grease pot
Grease leveling arm
Grease swing arm
9. End of shift activities
Report conditions to foreman o...
Hang reflectors
Properly dispose of damaged re...
Move the machine to the last o...
De-energize machine if necessa...
Go to mantrip, do a head count
Tag out
Place methane spotter on charg...
Place cap light on charger
Make notations on white board ...
Go home
Roof Bolter Operator
1.
Start-of-Shift Activities
Self evaluation
Am I rested
Can I keep my mind on the work today
Am I drug and alcohol free
Check in/Tag in
Change clothes
Get W-65
Conduct visual examination
Seal and dents
Get CSE SR-100
Check indicators
Conduct visual examination
Seal and dents
Obtain PPE
Metacarpal Gloves
Safety glasses
Hearing protection
Metatarsal safety shoes
Leather boots strongly recommended
Respirator
Reflective material on clothing
Hard hat
Get spotter
Check battery
Zero out
Obtain tools
Hammer
Channel locks
Cresent wrench
6" flat screw driver
Obtain supplies
Bits
Inserts
Bit clips
Drill steel
Drill wrenches
Reflectors
Dust filters
Rope hangers
Meet with foreman
Discuss roof control plan
Bolted/unbolted areas
Attend safety talk
Talk with previous shift bolter operator or check white board
Supplies
Condition of roof
Condition of bolting machine
Maintenance needed on roof bolter
Test holes
Entry width
Enter the mine
Get on mantrip
Put on safety glasses
Ensure everyone is seated before mantrip moves
Ensure mantrip had been pre-oped
Ensure clearance is granted
2.
Arrive at workplace
Exit mantrip
Conduct work place examination
Observe for mobile equipment
Check for bad top
Check for cracks, loose rock, taking on weight, water
Check for loose ribs
Start at corner of last open crosscut
Check for cracks
Check for brows
Check for sloughage
Look for uneven bottom
Undulation
Check for slip/trip hazards
Look for crib blocks, rock, banding material, cable, bolts
Check ventilation
Check fly pads
Check line curtains
Check for damaged bolts and bolt spacing
Visually inspect roof bolter cable
Check for flat places
Check for torn jacket
Ensure cable is hung properly
Insulated hangers
Insulated wire
Correct and/or report any unsafe conditions
Conduct work place examination
Repeat examination for each cut bolted
Observe for mobile equipment
Check for unsupported and bad top
Check for cracks, loose rock, taking on weight, water
Scale loose top with slate bar, if necessary
Spot bolt any area that can't be scaled
Check for loose ribs
Start at corner of last open crosscut
Cracks
Brows
Sloughage
Support or scale any loose ribs
Look for uneven bottom
Check for slip/trip hazards
Check ventilation before tramming through
Check fly pads and line curtains
Curtain must be maintained within two rows of bolts at all times until it is within 10' of the face
Avoid standing behind line curtain
Check for methane with spotter
1' from face/roof/rib
If magnet on head of miner is not used you must use a probe
Check for damaged bolts and wide bolt spacing
Correct and/or report any unsafe conditions
Ensure reflectors are installed on second row of bolts from face
3.
Conduct dust parameter exam
Energize machine
Check dust boxes
seals
filters
latches
Check water boxes
Check suction on drill head
Check cut ventilation
Report completion of exam to foreman
Foreman is required to record
4.
Pre-op on Roof Bolter
Ensure everyone is clear of the red zone
Check fire suppression
Check panic strip
Check operational controls
Make sure levers don't overlap or stick and proper "C" clips
Check boom up/down/rotation, foot jack, swing control, canopy jack, fast feed, torque valve, and boom extend
Check Tram controls
Deck
Make sure levers don't overlap or stick and proper "C" clips