Skip to content
Prepare for and make belt move Check and order supplies Belt Rollers Structure Chains Bolts Control, CO cable Water line, couplers, fire outlet if needed Phone cable Cement blocks or k-panels B-bond or foam sealer Door kit, if needed Anchoring material Splice kit Enter Sub-topic Assure battery equipment is fully charged Scoops Moon buggy battery Have extra battery Enter Sub-topic Assure bolting is complete Belt hangers Monorails Center bolting Cable bolts in intersections (if applicable) Screen ribs (if applicable) Ensure entry is cleaned and dusted Heading scooped and cleaned of spillage Run belt empty Communications Communicate with beltman how much slack you need Communicate with maintenance foreman Schedule preventive maintence Communicate with beltman when splice is spotted Communicate with beltman when they can splice it back together Spot a splice Lock and tag belt out Grip belt Break tail piece down Scatter structure Structure should be placed after cleaning entry Pull tail piece and install belt structure Build stoppings or k-walls Advance control and CO cable Set tail piece Anchor and align Advance water line Check distance from previous fire valves Resinstall water sprays Ensure all guards are reinstalled Ensure adequate walkways Install snap switches and CO's if needed Install visual pager and phone (if applicable) Rehang feeder switches Final cleanup Run belt and train Ensure stoppings are complete Check air flow on belt 50' per minute if air is flowing outby Enter Sub-topic Prior to Shift Look at production & delay sheet Check IN Examine safety items Ch4 Detector O2 Detector W65 CO Detector Anemometer PPE Walking Stick Barometer Cap Lamp Review Record Books Preshift Onshift Accident Reports Violations (if any) CM or Longwall Coordinator Instructions Review Construction Book Maintenance Log Review Section Map Mining Cycle Stopping Line Center Bolting Location Tailpiece Location Power Center Location End of Track Charging Station Projections Obtain Copies Review Call Out Sheet/Take Call Out Location of Mining Update Last 8 hours of Work Air Quality & Quantities Equipment Condition Unusual Conditions Equipment Problems During Previous Shift Critical Needed Replacement Parts Supplies Order Immediately Needed Supplies Countersign Preshift Examination Page Hazardous Conditions Violations Actions Remarks Communication Meeting Personnel Needs Construction Worker Assignment Maintenance Assignments Need for Extra Personnel Discuss Needed Supplies Discuss Planned Outages Discuss Scheduled Drills & Other Tasks Review Violations Discuss Actions to be Taken Discuss Alternative Plans For Section (Idle Shifts plans) Discuss Equipment Moves Pick Up Safety Message Obtain Necessary Carry In Materials & Supplies Check for Crew Members Arrival Obtain Substitutes if Necessary Check Training Obtain Necessary SWI Give Job Assignment Assess Fitness for Work Give Machine Operators Required Detectors Make Assignments as Needed (supplies, bus) Check Mine Clear System (All Preshifts Completed) Discuss Presence of Inspectors Assemble Crew & Enter the Mine Smokers Search General Observation for PPE Observe Check-In Check-Out End of Shift (surface) Check Out Check fire boss light and sign board Communicate w/shift foreman and master mechanic Charge spotters Review and sign fire boss books On-shift record Note corrective actions taken Pre-shift record Complete Production and Delay Report Fill out construction book (if applicable) Update section map Pay employees Turn in (when applicable) SWI's  Training Records Fire drills Escapeway drills Maintenance requests Safety meeting records Accident reports Grievances Check on supplies for next day Monitor and Coordinate Power Center Moves Communicate Mine foreman 1 day prior to and during move Maintenance foreman 1 day prior to and during move Belt foreman 1 day prior to and during move Conduct safety/pre-planning meeting (crew) Prior to move Notify dispatcher that you are moving CO monitors and power car During the move Conduct any required Task Training Determine supplies necessary Spads High line guarding Insulated hooks Tie wire Phone cable Spaner wrench High line messenger cable Slack cable Extra wench rope Ladder Clean entry Ensure scoops are charged (during shift prior to move) Ensure buggy anchors are in place Ensure center bolting is done Position face equipment Relocate power cables and water line in belt heading and rehang slack Miner Shuttle car Loader Relocate power cables in the track heading Shuttle car Bolters Fan Pull up belt tail piece Pull feeder cable up after tail piece has reached destination (if feeder is used) If feeder is not used, tram out of the way and pull cable Notify maintenance foreman that power needs to be de-energized from power car Lock Tag Grounded Instructors note on e-stop Maintenance needs to notify section foreman when cable had been locked, tagged and grounded Ensure caps are on plug receptacles and power car Unhook power cable from power car (if applicable) Pull high line car out of crosscut Pull power car to next site Ensure adequate clearance on both sides Pull high line car and hang high line High line needs to be guarded in crosscuts and at power center area Put high line car in crosscut with the power car Make sure HV car is frame grounded and cables guarded Reattach high line to power car Place mats Wear PPE Gloves Glasses Have rock dust and fire extinguisher Contact maintenace foreman to have power car reenergized Plug in equipment cables to power car (proper receptacles) and check ID tags Conduct on-shift of faces prior to energizing face equipment Explain reason for conducting on-shift Do not energize until all personnel are in the clear Test emergency stop at power car if H-V cable has been added  Move additional materials/equipment Fire hose Signs First aid equipment Water line Scoops chargers Dusters Phones SCSR's Tool car Dinner hole Test all equipment, cables Production Monitor start-up Loader Shuttle cars Belt Fan Duster Continuous miner Report start-up Make on-shift examinations 2-hour intervals (WV only) Same as initial on-shift Monitor employees Roof control plan, ventilation plan, and clean-up plan for compliance Safe work habits Conduct at least one SWI per week Efficiency Monitor equipment Efficiency Cycle times Safe operation Unusual odors, sounds Proper service Refer to service plans (written or verbal) See lube diagrams Chain tension Plan for repairs Write maintenance request Check construction work on section Masons Center-bolters Mechanics Track/utility Engineers Monitor employees Roof control plan, ventilation plan, and clean-up plan for compliance Safe work habits Conduct at least one SWI per week Efficiency Ensure they have adequate materials and direction Assign gathering and distribution of additional supplies Prepare to float through lunch Coordinate anticipated downtime Compile running list of tasks that can be performed during downtime Rock dusting Center bolting Advance water line Housekeeping duties Equipment maintenance End-of-shift Responsibilities (production) Needed supplies Order Immediately Needed Supplies Equipment condition Equipment Problems During Shift Critically Needed Replacement Parts Know what parts are broken/needed Location of center bolts - whats done Location of Mining Air Quality & Quantities Unusual Conditions Call out after pre-shift completed Report on construction work Enter the Mine Assign bus pre-op duty to crew member Monitor pre-op on mantrip Sanders SCSR's Jack and Bar Secure position Fire extinquisher Radio Controls Lights Brakes Adequate seating Bell, horn, etc. Trollery guard Pole + limiter and harp Batteries Fuses Compartment chains and hooks Small item storage Have mantrip operator contact dispatcher for clearance Repeat orders Report switch alignment Leave bottom Maintain adequate distance from other vehicles Maintain safe speed Utilize manholes Park in section Set park brakes Knock breakers on battery operated mantrip Correct or report any hazards observed to dispatcher Inform dispatcher of arrival