Petition - Docket No. 1997-082-C

In the matter of            Petition for Modification

Tanoma Mining Company

Tanoma Mine

I.D. No. 36-06967            Docket No. M-97-082-C

AMENDED PROPOSED DECISION AND ORDER

On July 7, 1997, a petition was filed seeking a modification of the application of 30 CFR 75.1700 to Petitioner's Tanoma Mine, located in Indiana County, Pennsylvania. On October 7, 1997, the petition was amended to include additional information in support of granting the petition. The local union president and safety committee members joined in submitting the petition amendment. 

On October 20, 1998, a Proposed Decision and Order (PDO) was issued granting the modification based on compliance with certain terms and conditions. On November 5, 1998, the Petitioner submitted certain amendments to the terms and conditions of the PDO for consideration. The amendments seek to clarify that the Petitioner is obligated to implement the well plugging and cut-through procedures set out in the PDO only when the safety barrier diameter is reduced to a distance less than the District Manager would approve pursuant to Section 75.1700 or when the Petitioner proceeds to cut-through a plugged well, and not whenever the safety barrier is reduced to less than a 300-foot diameter. MSHA agrees with the petitioner’s request to clarify the PDO as indicated. Accordingly, the Findings of Fact and Conclusion of Law section and the Granted clause have been modified and paragraph 2(a) of the terms and conditions amended to reflect the clarification. 

The Petitioner alleges that the alternative method outlined in the petition will at all times guarantee no less than the same measure of protection afforded by the standard.

MSHA personnel conducted an investigation of the petition and filed a report of their findings and recommendations with the Administrator for Coal Mine Safety and Health. After a careful review of the entire record, including MSHA's investigative report and recommendation, and the Petitioner’s November 5, 1998 comments, this Amended PDO is issued. This PDO supersedes the PDO issued on October 20, 1998. 

Finding of Fact and Conclusion of Law

The alternative method proposed by the Petitioner (as amended by the recommendations of MSHA investigators) will at all times guarantee no less than the same measure of protection afforded the miners under 30 CFR 75.1700. 

MSHA has amended the petitioner's alternative method to include terminology consistent with that used in the recent granting of similar petitions. The Petitioner provided clarifying information which indicates that the Lower Kittanning Coal Seam is the minable seam and that the known oil and gas wells (approximately 32 gas wells are located in the currently projected mining area) are approximately 3300 to 3500 feet in total depth. MSHA has added language which assures that the well plugging and cut-through precautions apply whenever the petitioner reduces the safety barrier diameter to a distance less than the District Manager would approve pursuant to Section 75.1700 or proceeds with an intent to cut-through a plugged well.

The petitioner alleged that the cleaning out and plugging of oil and gas wells and the cutting through of the plugged wells by applying appropriate safety precautions provide the same measure of protection as the standard. The mining industry experience supports this allegation and MSHA notes that the proposed well plugging uses methods initially developed by the U.S. Bureau of Mines which have proven to be effective through their application at numerous mines previously granted modifications to the standard. However, the petitioner’s proposed alternative method did not include a diligent effort to clean out and remove old casing from the gas wells to their total depth and did not include all of the safety precautions MSHA has required in granting such petitions. The petitioner provided no information in support of removing those requirements and precautions. Therefore, MSHA has retained those requirements and precautions by amending the proposed alternative method as shown in the granting terms and conditions of this PDO. 

On August 13, 1997, and February 13, 1998, James P. Lamont, UMWA International Health and Safety Representative, submitted letters through, Jeffrey Duncan, UMWA Deputy Director of the Department of Occupational Health and Safety, asserting that no continuous miners had ever mined through an oil or gas well in Pennsylvania and that doing so would result in a diminution of miner safety. MSHA has determined that there have been at least 12 successful and planned cut-throughs of gas and oil wells in Pennsylvania using the safety precautions set out in this Proposed Decision and Order.

On the basis of the petition, the findings of MSHA's investigation, and Petitioner’s November 5, 1998 comments Tanoma Mining Company is granted an amended modification of the application of 30 CFR 75.1700 to its Tanoma Mine.

ORDER

Wherefore, pursuant to the authority delegated by the Secretary of Labor to the Administrator for Coal Mine Safety and Health, and pursuant to Section 101(c) of the Federal Mine Safety and Health Act of 1977, 30 U.S.C., sec. 811(c), it is ordered that Tanoma Mining Company's Petition for Modification of the application of 30 CFR 75.1700 in the Tanoma Mine is hereby: 

GRANTED, for mining through or near (whenever the safety barrier diameter is reduced to a distance less than the District Manager would approve pursuant to Section 75.1700) plugged oil or gas wells penetrating the Lower Kittanning Coal Seam, conditioned upon compliance with the following terms and conditions:

1. Procedures to be utilized when plugging oil or gas wells. 

a. Cleaning out and preparing oil and gas wells. Prior to plugging an oil or gas well, the following procedure shall be followed: 

(1) A diligent effort shall be made to clean the borehole to the original total depth. If this depth cannot be reached, the borehole shall be cleaned out to a depth which would permit the placement of at least 200 feet of expanding cement below the base of the lowest minable coalbed. 

(2) When cleaning the borehole, a diligent effort shall be made to remove all the casing in the borehole. If it is not possible to remove all casing, the casing which remains shall be perforated, or ripped, at intervals spaced close enough to permit expanding cement slurry to infiltrate the annulus between the casing and the borehole wall for a distance of at least 200 feet below the base of the lowest minable coalbed. 

(3) If the cleanedout borehole produces gas, a mechanical bridge plug shall be placed in the borehole in a competent stratum at least 200 feet below the base of the lowest minable coalbed, but above the top of the uppermost hydrocarbon-producing stratum. If it is not possible to set a mechanical bridge plug, a substantial brush plug may be used in place of the mechanical bridge plug. 

(4) A suite of logs shall be made consisting of a caliper survey directional deviation survey, and log(s) suitable for determining the top and bottom of the lowest minable coalbed and potential hydrocarbon producing strata and the location for the bridge plug. 

(5) If the uppermost hydrocarbon-producing stratum is within 200 feet of the base of the lowest minable coalbed, properly placed mechanical bridge plugs or a suitable brush plug described in subparagraph (a)(3) shall be used to isolate the hydrocarbon producing stratum from the expanding cement plug. Nevertheless, a minimum of 200 feet of expanding cement shall be placed below the lowest minable coalbed. 

(6) The wellbore shall be completely filled and circulated with a gel that inhibits any flow of gas, supports the walls of the borehole, and densities the expanding cement. This gel shall be pumped through openend tubing run to a point approximately 20 feet above the bottom of the cleaned out area of the borehole or bridge plug. 

b. Plugging oil or gas wells to the surface. The following procedures shall be utilized when plugging gas or oil wells to the surface: 

(1) A cement plug shall be set in the wellbore by pumping an expanding cement slurry down the tubing to displace the gel and fill the borehole to the surface. (As an alternative, the cement slurry may be pumped down the tubing so that the borehole is filled with Portland cement or a Portland cementfly ash mixture from a point approximately 100 feet above the top of the lowest minable coalbed to the surface with an expanding cement plug extending from at least 200 feet below the lowest minable coalbed to the bottom of the Portland cement.) There shall be at least 200 feet of expanding cement below the base of the lowest minable coalbed. 

(2) A small quantity of steel turnings, or other small magnetic particles, shall be embedded in the top of the cement near the surface to serve as a permanent magnetic monument of the borehole.

c. Plugging oil or gas wells using the vent pipe method. The following procedures shall be utilized when using the vent pipe method for plugging oil and gas wells: 

(1) A 4 ½inch or larger vent pipe shall be run into the wellbore to a depth of 100 feet below the lowest minable coalbed and swedged to a smaller diameter pipe, if desired, which will extend to a point approximately 20 feet above the bottom of the cleaned out area of the borehole or bridge plug. 

(2) A cement plug shall be set in the wellbore by pumping an expanding cement slurry, Portland cement, or a Portland cementfly ash mixture down the tubing to displace the gel so that the borehole is filled with cement. The borehole and the vent pipe shall be filled with expanding cement for a minimum of 200 feet below the base of the lowest minable coalbed. The top of the expanding cement shall extend upward to a point approximately 100 feet above the top of the lowest minable coalbed. 

(3) All fluid shall be evacuated from the vent pipe to facilitate testing for gases. During the evacuation of fluid, the expanding cement shall not be disturbed. 

(4) The top of the vent pipe shall be protected to prevent liquids or solids from entering the wellbore, but permit ready access to the full internal diameter of the vent pipe when necessary. 

d. Plugging oil and gas wells for use as degasification boreholes. The following procedures shall be utilized when plugging oil or gas wells for subsequent use as degasification boreholes: 

(1) A cement plug shall be set in the wellbore by pumping an expanding cement slurry down the tubing to displace the gel and provide at least 200 feet of expanding cement below the lowest minable coalbed. The top of the expanding cement shall extend upward to a point above the top of the coalbed being mined. This distance shall be based on the average height of the roof strata breakage for the mine.

(2) To facilitate methane drainage, degasification casing of suitable diameter, slotted or perforated throughout its lower 150 to 200 feet, shall be set in the borehole to a point 10 to 30 feet above the top of the expanding cement. 

(3) The annulus between the degasification casing and the borehole wall shall be cemented from a point immediately above the slots or perforations to the surface. 

(4) The degasification casing shall be cleaned out for its total length. 

(5) The top of the degasification casing shall be fitted with a wellhead equipped as required by the District Manager. Such equipment may include check valves, shutin valves, sampling ports, flame arrestor equipment, and security fencing. 

2. The well plugging in Paragraph 1 and the following cut-through procedures (a-t) apply whenever the petitioner reduces the safety barrier diameter to a distance less than the District Manager would approve pursuant to Section 75.1700 or proceeds with an intent to cut through a plugged well:

a. Prior to reducing the safety barrier to a distance less than the District Manager would approve pursuant to Section 75.1700 or proceeding with an intent to cut through a plugged well, the operator shall notify the District Manager or designee.

b. The MSHA District Manager or designee shall conduct a conference prior to mining through any plugged well to review and approve the specific procedures for mining through the well. Representatives of the operator, the representative of the miners, and the appropriate State agency shall be informed, within a reasonable time prior to the conference, and be given an opportunity to attend and participate. This meeting may be called by the operator. 

c. Mining through a plugged well shall be done on a shift approved by the District Manager or designee. 

d. The District Manager or designee, representative of the miners, and the appropriate State agency shall be notified by the operator in sufficient time prior to the mining through operation in order to have an opportunity to have representatives present. 

e. When using continuous mining equipment, drivage sights shall be installed at the last open crosscut near the place to be mined to ensure intersection of the well. The drivage sites shall not be more than 50 feet from the well. 

f. Firefighting equipment, including fire extinguishers, rock dust, and sufficient fire hose to reach the working face area of the mining through shall be available when either the conventional or continuous mining method is used. The fire hose shall be located in the last open crosscut of the entry or room. All fire hoses shall be ready for operation during the mining through.

g. Sufficient supplies of roof support and ventilation materials shall be available and located at the last open crosscut. In addition, an emergency plug and/or plugs shall be available in the immediate area of the mine through.

h. At least the quantity of air required by the approved mine ventilation plan, but not less than 6,000 cubic feet of air per minute for scrubber equipped continuous miners or not less than 9,000 cubic feet per minute for continuous miner sections using auxiliary fans or line brattice only, shall be used to ventilate the working face during the mining through operation. 

i. Equipment shall be checked for permissibility and serviced on the shift prior to mining through the well and the water line maintained to the tail piece with a sufficient amount of fire hose to reach the farthest point of penetration on the section.

j. The methane monitor on the continuous mining machine shall be calibrated on the shift prior to mining through the well. 

k. When mining is in progress, tests for methane shall be made with a handheld methane detector at least every 10 minutes from the time that mining with the continuous mining machine is within 30 feet of the well until the well is intersected and immediately prior to mining through. During the actual cutting through process, no individual shall be allowed on the return side until mining through has been completed and the area has been examined and declared safe.

l. When using continuous mining methods, the working place shall be free from accumulations of coal dust and coal spillages, and rock dust shall be placed on the roof, rib and floor to within 20 feet of the face when mining through or near the well on the shift or shifts during which the cut through will occur.

m. When the wellbore is intersected, all equipment shall be deenergized and the place thoroughly examined and determined safe before mining is resumed. Any well casing shall be removed and no open flame shall be permitted in the area until adequate ventilation has been established around the wellbore. 

n. After a well has been intersected and the working place determined safe, mining shall continue inby the well a sufficient distance to permit adequate ventilation around the area of the wellbore. 

o. No person shall be permitted in the area of the mining through operation except those actually engaged in the operation, company personnel, representatives of the miners, personnel from MSHA, and personnel from the appropriate State agency. 

p. The mining through operation shall be under the direct supervision of a certified official. Instructions concerning the mining through operation shall be issued only by the certified official in charge. 

q. MSHA personnel may interrupt or halt the mining through operation when it is necessary for the safety of the miners.

r. A copy of the petition shall be maintained at the mine and be available to the miners.

s. The Petitioner shall file a plugging affidavit setting forth the persons who participated in the work, a description of the plugging work, and a certification by the Petitioner that the well has been plugged as described. 

t. Within 60 days after this PDO becomes final, the Petitioner shall submit proposed revisions for its approved 30 CFR Part 48 training plan to the Coal Mine Safety and Health District Manager. These proposed revisions shall include initial and refresher training regarding compliance with the terms and conditions stated in the PDO.

Any party to this action desiring a hearing on this matter must file in accordance with 30 CFR 44.14, as amended, (55 Federal Register, December 28, 1990) within 30 days. The request for hearing must be filed with the Administrator for Coal Mine Safety and Health, 4015 Wilson Boulevard, Arlington, Virginia 22203. 

If a hearing is requested, the request shall contain a concise summary of position on the issues of fact or law desired to be raised by the party requesting the hearing, including specific objections to the proposed decision. 

A party other than Petitioner who has requested a hearing shall also comment upon all issues of fact or law presented in the petition, and any party to this action requesting a hearing may indicate a desired hearing site. If no request for a hearing is filed within 30 days after service thereof, the Decision and Order will become final and must be posted by the operator on the mine bulletin board at the mine. 

 

 

 

 

Robert A. Elam

Deputy Administrator

for Coal Mine Safety and Health