November 4, 2005
In the matter of: Petition for Modification
Kingwood Mining Company, LLC
Whitetail Kittanning Mine
I.D. No. 46-08751 Docket No. M-2004-051-C
PROPOSED DECISION AND ORDER
On November 24, 2004, a petition was filed seeking a modification of the application of 30 CFR 75.364(b)(2) to Petitioner's Whitetail Kittanning Mine, located in Preston County, West Virginia.
The Petitioner alleges that application of this standard will result in a diminution of safety to the miners. Petitioner also alleges that the alternative method proposed in the petition will at all times guarantee no less than the same measure of protection afforded by the standard without unnecessarily exposing persons to hazardous conditions.
MSHA personnel conducted an investigation of the petition and filed a report of their findings and recommendations with the Administrator for Coal Mine Safety and Health. After a careful review of the entire record, including the petition and MSHA's investigative report and recommendation, this Proposed Decision and Order is issued.
Finding of Fact and Conclusion of Law
Application of 30 CFR 75.364(b)(2) to the subject mine will result in a diminution of safety to the miners and the special terms and conditions set out below will at all times provide a safe work environment to the miners.
The petitioner alleges approximately 400 feet of return aircourse from the 16 to 20 crosscut (return overcasts) in the West Mains No. 10 and No. 11 entries have become unsafe for mine examiners to travel. In addition, the proposed alternative method of having a certified person take weekly air quantity and quality measurements at monitoring stations MS-1, MS-2, MS-3, and MS-4 at the beginning and end of the unsafe-to-travel return aircourse segment will provide the same measure of protection as the standard.
MSHA’s investigation confirmed that roof falls have occurred in the No. 10 and No. 11 entries, rendering the aircourse unsafe for travel and essentially impractical to rehabilitate. The investigation also confirmed that the inlet and outlet monitoring points were accessible and excessive leakage at two overcasts was eliminated after construction of two stoppings located in the West Mains as shown on the attached map.
On the basis of the petition and the findings of MSHA's investigation, Kingwood Mining Company, LLC is granted a modification of the application of 30 CFR 75.364(b)(2)to its Whitetail Kittanning Mine.
ORDER
Wherefore, pursuant to the authority delegated by the Secretary of Labor to the Administrator for Coal Mine Safety and Health, and pursuant to Section 101(c) of the Federal Mine Safety and Health Act of 1977, 30 U.S.C., Sec. 811(c), it is ordered that Kingwood Mining Company, LLC’s Petition for Modification of the application of 30 CFR 75.364(b)(2) in the Whitetail Kittanning Mine is hereby:
GRANTED, for the examination of approximately 400 feet of unsafe-to-travel return aircourse from the 16 to the 20 crosscut (return overcasts) in the West Mains No. 10 and No. 11 entries, conditioned upon compliance with the following terms and conditions:
1. Four monitoring stations, MS-1, MS-2, MS-3, and MS-4, at the beginning and end of the unsafe-to-travel return aircourse segment, as shown on the attached map, shall provide effective evaluation of airflow through the affected area as follows:
(a) Two monitoring stations, MS-1 located just inby Survey Station No. 241 in the No. 11 entry of the West Mains and MS-2 located just inby Survey Station No. 232 in the No. 10 entry of West Mains shall monitor the air entering the petitioned area.
(b) Two monitoring stations, MS-3 located just inby Survey Station No. 200 in the No. 11 entry of West Mains and MS-4 located inby Survey Station No. 166 in the No. 10 entry of the West Mains, shall monitor the air exiting the petitioned aircourse.
2. Signs showing the safe travel route to each monitoring station shall be conspicuously posted in an adjacent travel entry. The monitoring stations and routes of travel to the monitoring stations shall be kept free of water accumulations.
3. A certified person shall conduct weekly evaluations at each of the monitoring stations. The evaluations shall include the quantity and quality of air entering or exiting the monitoring station. The evaluation shall also include a determination of the aircourse's leakage, defined and measured as stated in Paragraph 8 below. These air measurements shall be made using MSHA-approved and calibrated hand-held multi-gas detectors to check the methane and oxygen gas concentrations and appropriate, calibrated anemometers to check airflow volume.
4. A diagram showing the normal direction of the airflow shall be posted at the monitoring stations. The diagram shall be maintained in legible condition and any change in airflow direction shall be reported to the mine foreman for immediate investigation.
5. The date, initials of the examiner, time, and the measured quantity and quality of air shall be recorded in a book or on a date board that shall be provided at the monitoring stations. Such results, including the condition of the accessible permanent ventilation controls creating the aircourse, shall also be recorded in a book kept on the surface and made accessible to all interested parties.
6. All monitoring stations and approaches to monitoring stations shall, at all times, be maintained in a safe condition. The roof shall be adequately supported by roof bolts or other suitable means to prevent deterioration of the roof in the vicinity of the stations.
7. Methane gas or other harmful, noxious, or poisonous gases shall not be permitted to accumulate in excess of legal limits for return air. An increase of 0.5 percent methane above the last previous methane reading or a 10 percent change in air flow quantity shall cause an immediate investigation of the affected area. The results of the investigation shall be immediately reported to the mine foreman.
8. The aircourse's initial leakage shall be determined during the first evaluation following implementation of this modification. Leakage is defined as the discrepancy between the air quantity entering and exiting the aircourse, as measured at the monitoring stations. A 10 percent change from the initial leakage in the aircourse shall cause immediate examination of all permanent ventilation structures. Damaged stoppings or other ventilation structures shall be repaired or replaced to minimize leakage. Following repairs, a new “initial leakage” shall be determined and serve as the basis for subsequent evaluations.
9. The monitoring station locations shall be shown on the annually submitted mine ventilation map. The stations shall not be moved to another location without prior approval by the District Manager as a part of the Ventilation Plan for the mine.
10. Prior to implementing this modification, all mine personnel shall be instructed that, except along designated routes, no travel into the petitioned area shall be permitted and all other approaches shall be fenced off or barricaded with "DO NOT ENTER" warning signs. Entry into the area shall be permitted only to conduct investigations and correct problems with air flow detected through the monitoring process and all such work will be done under the supervision of an authorized person. All persons who work in the area shall be instructed in the emergency evacuation procedures and all provisions of 30 CFR 75.1502 and 75.383.
11. Within 60 days after this Proposed Decision and Order becomes final, the Petitioner shall submit proposed revisions for its approved 30 CFR Part 48 training plan to the Coal Mine Safety and Health District Manager. These proposed revisions shall include initial and refresher training regarding compliance with this Proposed Decision and Order.
Any party to this action desiring a hearing on this matter must file in accordance with 30 CFR 44.14, within 30 days. The request for hearing must be filed with the Administrator for Coal Mine Safety and Health, 1100 Wilson Boulevard, Arlington, Virginia 22209-3939.
If a hearing is requested, the request shall contain a concise summary of position on the issues of fact or law desired to be raised by the party requesting the hearing, including specific objections to the proposed decision. A party other than Petitioner who has requested a hearing shall also comment upon all issues of fact or law presented in the petition, and any party to this action requesting a hearing may indicate a desired hearing site. If no request for a hearing is filed within 30 days after service thereof, the Decision and Order will become final and must be posted by the operator on the mine bulletin board at the mine.
John F. Langton
Deputy Administrator for Coal Mine Safety and Health