PROPOSED DECISION AND ORDER
On March 12, 2026, ICG Beckley LLC filed a petition seeking modification of the application of 30 Code of Federal Regulations (30 C.F.R.) § 75.351(h) at its Beckley Pocahontas Mine located in Raleigh County, West Virginia. The petitioner alleges that the alternative method in the petition will at all times guarantee no less than the same measure of protection afforded to the miners by the standard.
The petitioned standard, 30 C.F.R § 75.351(h) – Atmospheric monitoring systems, states, in relevant part,
Location of sensors – electrical installations.
When monitoring intake air ventilating underground transformer stations, battery charging stations, substations, rectifiers, or water pumps under § 75.340(a)(1)(ii) or § 75.340(a)(2)(ii), at least one sensor must be installed to monitor the mine atmosphere for carbon monoxide or smoke, located downwind and not greater than 50 feet from the electrical installation being monitored.
The petitioner is requesting a modification of the standard to allow atmospheric monitoring system sensors to be installed greater than 50 feet from electrical installations being monitored in certain areas of the mine.
MSHA personnel investigated the merits of the petition and filed a report of their findings with the Administrator for Mine Safety and Health Enforcement. After a careful review of the entire record, including the petition and MSHA's investigative report, the Administrator issues this Proposed Decision and Order.
Findings of Fact and Conclusions of Law
On July 1, 2026, MSHA conducted an onsite investigation of the petition. The investigator reviewed proposed alternative method, verified that the petition was posted on the mine’s bulletin board, and explained the petition process and all stipulations to the miners and supervisors. The Representative of Miners received notice of the investigation but did not attend.
The mine produces bituminous coal from the Pocahontas No. 3 seam, employing 346 miners across five sections with nine continuous mining units, averaging 10,000 tons per day. It operates two production shifts and one maintenance shift five to six days a week. Ventilation is provided by a single exhausting fan with three openings, and the mine liberated 2,387,296 cubic feet of methane in the third quarter of 2026.
Miners access the mine via an elevator shaft to the “Bottom Area”, which houses diesel powered personnel carriers, mine supplies, diesel powered supply motors, a personnel carrier repair shop, and the No. 1 belt head. Each shift, approximately 5 to 7 miners work in the Bottom Area and along the No. 1 and No. 2 belts.
On January 29, 2026, ICG Beckley requested a revision to its approved Ventilation Plan to permit the utilization of belt intake air to ventilate certain working sections of the mine. After two reviews, MSHA approved the revised plan on February 19, 2026. The revised plan permits belt-entry air to ventilate working sections, including the Bottom Area. This approval means that MSHA allows the clean intake air, needed to dilute explosive mine gases and coal dust, to travel in the air course directly over the mine’s conveyor belt on its way to the area where miners work and breathe.
Historically, the use of belt air has been a safety issue. This is because conveyor belts, belt drives, electrical installations, and combustible accumulations present recognized underground fire hazards. A fire involving these sources can spread along the belt entry and produce smoke, carbon monoxide, and other combustion products that mine ventilation may carry toward miners. This risk is especially significant where belt-entry air ventilates working sections because the ventilation intentionally would push the smoke and toxic gases directly to where the miners are working.
The consequences of delayed belt-entry fire detection are well established. Conveyor-belt fires can spread substantial distances and expose miners to smoke and toxic gases. In the January 19, 2006, fire at the Aracoma Alma Mine No. 1, a fire occurred near a longwall conveyor-belt drive. Heavy smoke was encountered by evacuating miners, and two miners died. The accident demonstrates the severe consequences when a belt-entry fire and its smoke and toxic gases affect miners located inby the fire.
To protect against these hazards, under 30 C.F.R. § 75.350, MSHA requires mines to use an Atmospheric Monitoring System (AMS) when it approves the use of belt air to ventilate a working section. An AMS is a computer-based monitoring system that uses carbon monoxide (CO) sensors, data transmission components, and automatic alarms to provide continuous detection and early warning of abnormal atmospheric conditions so miners can evacuate or respond before smoke and toxic gases reach occupied areas or escapeways.
The AMS must be operated in accordance with 30 C.F.R. § 75.351. This section establishes the minimum safety requirements for an effective AMS, such as providing audible and visual warning signals, establishing alert and alarm levels, and setting the location of sensors needed to detect a fire. At issue here is 30 C.F.R § 75.351(h) that requires, when monitoring intake air ventilating underground transformer stations, battery charging stations, substations, rectifiers, or water pumps under § 75.340(a)(1)(ii) or § 75.340(a)(2)(ii), at least one sensor must be installed to monitor the mine atmosphere for carbon monoxide or smoke, located downwind and not greater than 50 feet from the electrical installation being monitored.
MSHA notes that the subject belt entries utilize Part 14-approved flame-resistant belting. While the flame-resistant properties of the belting reduce the likelihood and severity of belt-fire propagation, they do not eliminate the potential for fires involving electrical installations, belt components, combustible accumulations, or other ignition sources. Part 14 flame-resistance requirements and AMS fire-detection requirements address different hazards and are intended to function as complementary layers of protection, not as substitutes for one another. Accordingly, the presence of Part 14-approved belting does not eliminate the need for prompt detection of combustion products or support reducing the fire-detection protection afforded by § 75.351(h).
The petitioner states there are 18 electrical installations in the Bottom Area and belt entries subject to the AMS requirements in 30 C.F.R. § 75.351(h), 15 of which are subject to the request in this petition. Instead of having the 15 required AMS sensors, the petitioner proposes to use only five “strategically located” AMS sensors to monitor the entire area for all of the 15 installations, each of which represents potential a fire hazard, and with each proposed AMS sensor located more than 50 feet downwind of one or more of the installations. The petitioner attributes this change to frequent nuisance readings from diesel equipment under the newly approved ventilation plan when sensors are located within 50 feet.
The petitioner relies on modeling that assumes airflow of 108,297 cubic feet per minute and an average velocity of 505 feet per minute, resulting in estimated CO detection times ranging from 9 to 128 seconds. The petitioner also argues that miner and diesel-equipment operators in the area would provide additional early detection of combustion events.
MSHA has carefully evaluated the petitioner’s proposed alternative method, the conditions in the affected areas, and the protection afforded by 30 C.F.R. § 75.351(h). For the following reasons, MSHA finds that the proposed method would not at all times guarantee the same measure of protection as the mandatory standard.
The proposal would replace 15 installation-specific monitoring points with five sensors in the general area intended to monitor multiple installations over substantially greater distances. 30 C.F.R. § 75.351(h)’s 50-foot placement requirement promotes prompt and reliable detection by limiting both transport time and the opportunity for combustion products to spread/disperse before reaching the nearest sensor. It also ensures that each covered installation is monitored directly rather than through generalized monitoring of a larger area.
The proposed method would take too long to warn miners about a fire. MSHA determined that the petitioner’s modeling treats the Bottom Area and associated belt entries as a single, uniform airway and assumes that the modeled average velocity of approximately 505 feet per minute will be maintained throughout each source-to-sensor path. There is no evidence to support this. In fact, airflow near individual electrical installations may differ from airflow measured in the open entry, and an actual fire may further disrupt air quantity, velocity, direction, and distribution through fire-generated heat and smoke, damage to ventilation controls, ventilation-equipment operation or failure, or firefighting activities. These conditions could delay or divert the movement of smoke and toxic gases and reduce the concentration reaching a remote sensor.
This concern is most apparent where the installation is approximately 1,000 feet from its proposed sensor – 20 times further away than where it is required to be. Here, even under ideal, uninterrupted transport, smoke and toxic gases would require approximately 2 minutes to travel that distance at 505 feet per minute, but approximately 20 minutes if the ventilation were to become reduced to the minimum belt-entry velocity of 50 feet per minute under § 75.350(a)(2). By comparison, travel over the 50-foot distance required by § 75.351(h) would take approximately 1 minute at 50 feet per minute and approximately 6 seconds at 505 feet per minute. Every second counts in an underground mine fire, and it would be less safe to allow the petitioner to slow down fire detection in this manner.
The petition also provides no site-specific testing or analysis establishing that dilution and dispersion over distances approaching 1,000 feet would be insignificant or that smoke and toxic gases from each installation would reach the proposed sensor at concentrations sufficient to activate the applicable alert or alarm. In other words, there is no evidence that the AMS sensor could even detect smoke and toxic gases from a fire that is 1,000 feet away.
Furthermore, the proposed method also takes away the petitioner’s ability to pinpoint the source of a mine fire. Monitoring several widely separated installations with one sensor would complicate identification of the source after an alarm, potentially delaying investigation and corrective action. A single sensor intended to monitor a wide area containing multiple installations cannot provide detection equivalent to sensors placed at the required locations 50 feet downwind from each installation. This is less safe than the standard.
The petitioner asserts that miners frequently work and travel in the Bottom Area and will detect signs of combustion. MSHA notes that miner presence does not provide continuous, automatic monitoring and cannot substitute for AMS coverage required under § 75.351. Human detection is intermittent, dependent on location, and is not effective during periods when miners are absent, inattentive, or obstructed by noise, diesel exhaust, or other environmental factors. The standard’s purpose is to warn before conditions are evident to personnel.
Finally, the petitioner states that nuisance CO alarms caused by diesel equipment activity justify eliminating the 50‑foot requirement. However, MSHA finds that nuisance alarms cannot form the basis for lessening the required fire‑detection coverage, especially in light of other allowable methods to mitigate them. First, § 75.351(m) allows the District Manager to approve specified time delays in the mine’s ventilation plan where a demonstrated need exists. Such delays permit elevated CO levels to persist for a limited period before an alert or alarm is recognized at the surface, reducing non-fire-related alarm activations while maintaining the required fire-detection coverage. Second, diesel discriminating sensors differentiate CO from diesel exhaust versus CO from combustion, minimizing nuisance alarms while maintaining reliable fire detection. The petitioner has previously implemented these technologies successfully in other areas of the operation. These measures address nuisance alarms without compromising miner safety or removing sensors from required protective locations. Additionally, MSHA notes that during the interviews conducted for the on-site investigation, there were no nuisance alarms along the subject area mentioned by any of the miners.
Based on the investigation discussed above, MSHA determined that the petition does not provide an alternative method of compliance that will at all times guarantee no less than the same level of protection to the miners. Accordingly, ICG Beckley LLC is denied a modification of the application of 30 C.F.R. § 75.351(h) at its Beckley Pocahontas Mine.
ORDER
Wherefore, pursuant to the authority delegated by the Secretary of Labor to the Administrator for Mine Safety and Health Enforcement and pursuant to Section 101(c) of the Federal Mine Safety and Health Act of 1977, 30 U.S.C. § 811(c), it is ordered that ICG Beckley LLC ’s Petition for Modification of the application of 30 C.F.R. § 75.351(h) in the Beckley Pocahontas Mine is hereby:
DENIED
Any party to this action desiring a hearing on this matter must file in accordance with 30 C.F.R. § 44.14 within 30 days. The request for hearing must be filed with the Administrator for Mine Safety and Health Enforcement, 200 Constitution Ave NW, Suite C3522, Washington, DC, 20210.
Any hearing request must contain a concise summary of position on the issues of fact or law to be raised by the party requesting the hearing, including specific objections to the proposed decision. A party other than the Petitioner who has requested a hearing may also comment on all issues of fact or law presented in the petition, and any party to this action requesting a hearing may indicate a desired hearing site.
If no request for a hearing is filed within 30 days after service of this Proposed Decision and Order, the Decision and Order will become final and must be posted by the operator on the bulletin board at the mine.
Timothy R. Watkins
Administrator for
Mine Safety and Health Enforcement
Certificate of Service
I hereby certify that a copy of this proposed decision was served personally or mailed, postage paid, or provided by other electronic means this 6th day of November, 2026, to:
Christopher D. Pence
Justin K. Chandler
PENCE LAW FIRM PLLC
10 Hale Street, 4th Floor
Charleston, WV 25301
Phone: (304) 345-7250
Fax: (304) 345-9941
cpence@pencefirm.com
jchandler@pencefirm.com
Alexander Bullinger
General Engineer