Petition - Docket No. M-2008-011-C

 

In the matter of: Petition for Modification Chevron Mining, Inc.

North River No. 1 Mine

I.D. No. 01-00759 Docket No. M-2008-011-C

 

PROPOSED DECISION AND ORDER

 

On, April 8, 2008 a petition was filed seeking a modification of the application of 30

C.F.R. § 75.507 to Petitioner's North River No. 1 Mine, located in Fayette County, Alabama. The Petitioner alleges that the alternative method outlined in the petition will at all times guarantee no less than the same measure of protection afforded by the standard.

 

MSHA personnel conducted an investigation of the petition at the North River No. 1 Mine and filed a report of their findings with the Administrator for Coal Mine Safety and Health. After a careful review of the entire record, including the petition and MSHA's investigation report, this Proposed Decision and Order is issued.

 

Finding of Fact and Conclusion of Law

 

The applicable standard, 30 C.F.R. § 75.507, states

 

Except where permissible power connection units are used, all power- connection points outby the last open crosscut shall be in intake air.

 

The petitioner is using three-phase, alternating current deep well pumps in boreholes in the mine. One submersible high voltage pump is located in each of the sealed areas of the H-Main and West Panels of the mine.

 

The sealed area identified as Hugh-Panels (H-Mains) is created by 9 cementious pumped seals with 20 psi ratings. In April 2008, one seal in the H-Main set failed due to impounded water and was replaced with another cementious seal.

 

The sealed area identified as the West Panels, including the L-3 through the L-10 panels (location know as the Tyro Seals), was sealed using Strata Mine Services Stratacrete seals with a 120 psi rating. These seals were installed in March 2008. The panels

 

identified as L-1 and L-2 located outby the Tyro Seals had been previously sealed in 2005 using Mitchell-Barrett type seals with a 20 psi rating.

 

The sealed areas affected by the petitioner’s proposed alternative method were created prior to October 20, 2008 and not subject to the final rule concerning the construction of seals, 30 C.F.R. §75. 335, which revised MSHA's Emergency Temporary Standard (ETS) and addressed sealing abandoned areas in underground coal mines (Federal Register: April 18, 2008 (Volume 73, Number 76). The final rule required that ignition hazards in the area to be sealed be removed to the extent possible prior to sealing and the seals constructed in underground coal mines after October 20, 2008 be designed, constructed and maintained in accordance with the provisions of 30 C.F.R. 75.335.

 

The operator must remove insulated cables, batteries, metallic objects through or across seals and other potential electric ignition sources from the area, unless it is not safe to do so. If ignition sources cannot safely be removed, seals must be constructed to at least 120 psi.

 

Since the aforementioned pumps had been installed in areas which were sealed prior to October 20, 2008, the operator is proposing an alternative method applicable to 30

C.F.R. § 75.507.

 

The alternative method proposed by the petitioner (as amended by the recommendations of MSHA investigators) will at all times guarantee no less than the same measure of protection afforded the miners under 30 C.F.R. § 75.507.

 

MSHA is requiring, for this petition only, that the surface pump control and power circuits be examined in accordance with 30 C.F.R. § 77.502 requirements, since the control and power circuits that enter the underground portions of the mine cannot be examined in their entirety to satisfy the requirements of 30 C.F.R. § 75.512 or the 30

      1. )(7)weekly examination requirement.

         

        On the basis of the petition and the findings of MSHA's investigation, Chevron Mining, Inc. is granted a modification of the application of 30 C.F.R. § 75.507 to its North River No. 1 Mine.

         

        ORDER

         

        Wherefore, pursuant to the authority delegated by the Secretary of Labor to the Administrator for Coal Mine Safety and Health, and pursuant to Section 101(c) of the Federal Mine Safety and Health Act of 1977, 30 U.S.C. § 811(c), it is ordered that Chevron Mining, Inc.’s Petition for Modification of the application of 30 C.F.R. § 75.507 in the North River No. 1 Mine is hereby:

         

        GRANTED, for the use of three-phase, 2,400- or 4,160-volt alternating-current submersible pump(s) installed in boreholes of inaccessible sealed areas outby the last open crosscut which are not ventilated with intake air in the North River No. 1 Mine, conditioned upon compliance with the following terms and conditions:

         

        1. The three-phase, 2,400-volt or 4,160-volt alternating-current electric power circuit(s) for the pump(s) shall be designed and installed to:

           

          1. Contain either a direct or derived neutral wire, which must be grounded through a suitable resistor at the source transformer or power center and through a grounding circuit originating at the grounded side of the grounding resistor, which must extend along with the power conductors and serve as the grounding conductor for the frame of the pump and all associated electric equipment that may be supplied power from this circuit. The borehole casing shall be bonded to the system grounding medium.

             

          2. Contain a grounding resistor that limits the ground-fault current to not more than the values listed below.

             

            1. For circuits of 2,400 volts or less: 6.5 amperes

               

            2. For circuits over 2,400 volts: 3.75 amperes

               

          3. The grounding resistor(s) must be rated for the maximum fault current available and must be insulated from ground for a voltage equal to the phase-to-phase voltage of the system.

             

        2. The high voltage pump circuit(s) shall be provided with a suitable circuit interrupting device of adequate interrupting capacity with devices to provide protection against undervoltage, grounded phase, short-circuit, and overload.

           

        3. The under-voltage protection device must operate on a loss of voltage to prevent automatic restarting of the equipment.

           

        4. The grounded-phase protection must be provided as listed in the following.

           

          1. The grounded-phase protection device must be set not to exceed 40 percent of the current rating of the neutral grounding resistor.

             

          2. The high-voltage circuit must also provide the following:

             

            1. A “look ahead” circuit device to prevent closing the contactor when a phase to ground fault condition exists on the system.

               

            2. A test circuit that will inject a test current through the grounded- phase current transformer.

               

        5. The short circuit protection device shall not be set to exceed the required short circuit protection for the power cable or 75 percent of the minimum available phase-to-phase short circuit current, whichever is less.

           

        6. The power system must contain a disconnecting device located on the surface and installed in conjunction with the contactor to provide the following.

           

          1. A means to provide visual evidence that the power is disconnected from the pump circuit(s).

             

          2. A means to lock and tag out the system.

             

          3. The “high-voltage” circuit must be designed to prevent entry into the pump controller unless the disconnect handle is in the off position and the circuit is grounded.

             

        7. The pump power systems(s) must include a fail-safe ground check circuit or other no less effective device approved by the Secretary that must cause either a circuit breaker or a contactor to open when either the ground or pilot wire is broken.

           

        8. The incoming high-voltage three-phase alternating current system must be provided with a low resistance grounded medium for the grounding of the lightning arrestors for the pump power circuit(s) that is separated from the mine neutral grounding medium by a distance of not less than 25 feet.

           

        9. The pump(s) electric control circuit(s) must be designed and installed so that:

           

          1. The pump(s) cannot start and/or run in either the manual or the automatic mode if the water is below the low water probe level.

             

          2. The low water probe shall be located not less than 30 feet above the pump inlet and motor and electrical connections of the pump(s).

             

          3. The low water probe must be suitable for submersible pump control application.

             

          4. All probe circuits must be intrinsically safe.

             

          5. A motor controller must be provided and used for pump startup and shutdown.

             

          6. A remote control and monitoring system can be used with the pump system for the purpose of condition monitoring and for remote startup/shutdown control of the pump(s).

             

          7. Overcurrent, ground fault, and overload fault conditions must not be able to be reset from the remote location.

             

        10. The surface pump(s) control and power circuits must be examined as required by 30 C.F.R. § 77.502.

           

        11. The power cable(s) to the submersible pump motor must be suitable for this application and have a current carrying capacity not less than 125 percent of the full load current of the submersible pump motor and an outer jacket suitable for a “wet location.” High-voltage type cables must meet the requirements of 30 C.F.R. § 75.804.

           

        12. Splices and connections made in submersible pump cables shall be made in a workmanlike manner and shall meet the requirements of 30 C.F.R.

          § 75.604.

           

        13. The pump installations must comply with all other applicable 30 C.F.R. requirements.

           

        14. Petitioner must at all times ensure compliance with 30 C.F.R.

          § 75.705-1(a),(b), and (c).

           

        15. The pump casing which passes through the previously mined coal seam must remain underwater at all times.

           

        16. The District Manager shall be notified when any submersible pump is installed in boreholes. The District shall have the opportunity to inspect the installation before the pump is put into operation.

           

        17. Within 60 days after this Petition for Modification is granted, the Petitioner shall submit proposed revisions for their approved 30 C.F.R. Part 48 training plan to the Coal Mine Safety and Health District Manager. These proposed revisions shall specify task training for all qualified mine electricians who perform electric work and monthly electric examinations as required by 30 C.F.R. § 77.502 and refresher training regarding the alternative method outlined in the petition and the terms and conditions stated in the Proposed Decision and Order.

           

        18. The procedures of 30 C.F.R. § 48.3 for approval of proposed revisions to already approved training plans shall apply.

 

Any party to this action desiring a hearing on this matter must file in accordance with 30 C.F.R. § 44.14, within 30 days, a request with the Administrator for Coal Mine Safety and Health, 1100 Wilson Boulevard, Arlington, Virginia 22209-3939. If a hearing is requested, the request shall contain a concise summary of position on the issues of fact or law desired to be raised by the party requesting the hearing, including specific objections to the proposed decision.

 

A party other than Petitioner who has requested a hearing may also comment upon all issues of fact or law presented in the petition, and any party to this action requesting a hearing may indicate a desired hearing site. If no request for a hearing is filed within 30 days after service thereof, the Decision and Order will become final and must be posted by the operator on the mine bulletin board at the mine.

 

 

 

Charles J. Thomas
Acting Deputy Administrator for
Coal Mine Safety and Health