Program Information Bulletins
PIB Number | Title | Issue Date |
---|---|---|
P16-02 |
Reissue of P10-02 Examination of Electrical Underground Coal Mine Equipment |
04/13/2016 |
P16-01 |
Corrective Action Programs |
02/16/2016 |
PIB Number | Title | Issue Date |
---|---|---|
P15-04 |
Additional Option for Payment of Civil Penalties |
07/16/2015 |
PIB Number | Title | Issue Date |
---|---|---|
P14-05 |
Additional Filing Options for Representative of Miners |
06/19/2014 |
P14-02 |
Reissue of P08-12 - Technologically Achievable, Administratively Achievable, and Promising Noise Controls (30 CFR Part 62) |
03/07/2014 |
P14-01 |
Reissue of P12-08 - Global Positioning System (GPS) and Established Surface Stations or Markers |
02/21/2014 |
PIB Number | Title | Issue Date |
---|---|---|
P12-07 |
Neutral Start Methods on Mobile Electrical Equipment |
04/03/2012 |
P12-06 |
Reissue of P07-19 - Hazards of Sliding Table Masonry Saws |
03/23/2012 |
P12-05 |
Reissue of P07-21 - Clarification of Requirements of Conveyor Start-Up Warnings for 30 CFR §§ 56.14201 and 57.14201 |
03/21/2012 |
P12-04 |
Reissue of P07-06 - Guy Wires of Poles Supporting High-Voltage Electric Power Lines |
03/21/2012 |
P12-03 |
Escape Capsules in Underground Coal Mines |
03/21/2012 |
P12-02 |
New Notification Alternatives to Comply with 30 CFR §§ 56/57.1000 |
02/07/2012 |
PIB Number | Title | Issue Date |
---|---|---|
P11-52 |
Potential Shock and Ignition Hazard Involving Permissible and Non-permissible Battery-Powered Machines |
11/28/2011 |
P11-50 |
Rock Dust Composition, 30 C.F.R. § 75.2 |
10/27/2011 |
P11-49 |
Reissue of P08-16 - Clarification of Procedures to Use When |
09/08/2011 |
P11-47 |
Compressed Gas System Leakage |
06/22/2011 |
P11-43 |
Reissue of P05-20 - Evaluation of Diesel Particulate Matter After-Treatment Devices on Non-Permissible, Heavy-Duty, Diesel-Powered Equipment, Compressors and Generators |
06/20/2011 |
P11-42 |
Run-through Check Curtains |
05/20/2011 |
P11-41 |
Re-Issue of P09-11 - Application of 30 C.F.R. §§ 77.405(b), 56.14211, 57.14211, 56.14105, and 57.14105 to Dragline Masts |
05/20/2011 |
P11-38 |
Re-Issue of P02-04 - Potential Health Hazard Caused by Platinum-Based Catalyzed Diesel Particulate Matter Exhaust Filters |
05/16/2011 |
P11-36 |
Suitable Hard Hats |
05/10/2011 |
P11-35 |
Re-Issue P08-02 -- Reporting Deaths on Mine Property |
05/09/2011 |
P11-34 |
Responsibility for Proper Assembly and Maintenance of MSHA Approved and Certified Mining Machines and Equipment |
05/06/2011 |
P11-32 |
Re-Issue of P09-15 - Potential Safety Hazard Related to Explosion of Pumps |
04/28/2011 |
P11-27 |
Reissue of P05-01 - Final Effective Date for Underground Coal Diesel Particulate Standard and Availability of Report on Issues Related to High Temperature Diesel Particulate Filters (HTDPFs) Including Laboratory Results on Kindling Temperatures |
06/20/2011 |
P11-25 |
Reissue of P04-17 - Potential Fire Hazard of Diesel Particulate Matter (DPM) Collected on High Temperature Disposable Diesel Particulate Filters (HTDPF) |
04/13/2011 |
P11-22 |
Reissue of P08-15 - Fire Suppression Systems Used to Protect Battery Charging Stations and Other Unattended Electrically Powered Equipment in Underground Coal Mines |
04/01/2011 |
P11-18 |
Reissue of P07-05 - The Danger of Oxygen Deficiency in Underground Coal Mines |
04/01/2011 |
P11-17 |
Reissue of P09-41 - Voluntary Program to Evaluate New or Novel Fire Suppression Agents and Devices Used for Manual Fire Fighting Purposes |
03/30/2011 |
P11-16 |
Reissue of P02-05 - Crushing Hazard on Mobile Bridge Conveyor (MBC) |
03/30/2011 |
P11-15 |
Reissue of P09-32 - Safe Design or Retrofit for Safely Resetting the Main Disconnect on Battery-Powered Scoops in Underground Mines |
03/23/2011 |
P11-14 |
Reissue of P08-03 - Use of Stabilizers (Outriggers) on Chassis-Mounted Drills and Cranes |
03/23/2011 |
P11-12 |
Reissue of P07-26 - Charging of Lithium Ion or Lithium Polymer Batteries |
03/23/2011 |
P11-11 |
Reissue of P07-31 - Use of Fall Protection In, Around, or Over Any Shaft and Conveyance Safety Measures |
03/23/2011 |
P11-10 |
Reissue of P04-15 - Transmission of Respirable Dust Samples by Mine Operators and Correction of Dust Data Card Information |
03/23/2011 |
P11-09 |
Reissue of P06-05 - Requirements of Testing High-Voltage Gloves |
03/16/2011 |
P11-08 |
Reissue of P07-22 - Operation of Continuous Haulage Systems |
03/18/2011 |
P11-07 |
Re-Issue of P09-30 - Short Circuit Protection For Trailing Cables Longer Than 500 Feet |
03/18/2011 |
P11-05 |
Reissue of P06-10 - Hazards When Transporting Off-Track Equipment |
03/16/2011 |
P11-04 |
Re-Issue of P09-19 - Tree Cutting on Mine Property |
03/16/2011 |
P11-03 |
Re-Issue P09-23 - Underground Scoop Accidents |
03/02/2011 |
P11-02 |
Re-Issue of P09-02 - Filing of Ground Control Plans for Surface Coal Mines |
02/25/2011 |
PIB Number | Title | Issue Date |
---|---|---|
P10-20 |
Re-Issue of P-03-13-Trailing Cable Overheating On Equipment Cable Reels |
10/25/2010 |
P10-17 |
Miners' Protections against Discrimination for Exercising Statutory Rights and Procedures to Protect those Rights |
09/02/2010 |
P10-16 |
Hazardous Condition Complaints and Right to Request Inspections |
09/02/2010 |
P10-15 |
Prohibition of Advance Notice of § 103(a) Inspections |
08/26/2010 |
P10-14 |
Clarification of MSHA Policy and Regulations Related to SCSRs |
08/26/2010 |
P10-13 |
30 C.F.R. § 75.324, Intentional Changes In The Ventilation System |
08/16/2010 |
P10-12 |
Maintaining Methane Monitors in Permissible and Proper Operating Condition for Mining Equipment |
08/16/2010 |
P10-11 |
Maintaining Face Ventilation Control Devices |
08/16/2010 |
P10-10 |
Inadequate Ventilation |
08/16/2010 |
P10-09 |
Safety Precautions for Operating Rubber Tired and Track-Mounted Excavators |
07/13/2010 |
P10-08 |
Use of Fall Protection at River Loading Facilities |
07/08/2010 |
P10-06 |
Low-Weight Gain Respirable Dust Samples Submitted by Mine Operators |
06/18/2010 |
P10-04 |
Safe Access, Fall Prevention and Fall Protection involving Self-Propelled |
06/16/2010 |
P10-01 |
MSA Topgard Protective Cap with Lamp Bracket & Cord Holder and MSA V-Gard Protective Cap |
01/20/2010 |
PIB Number | Title | Issue Date |
---|---|---|
P09-42 |
Audits on Permissible Underground Mining Equipment |
10/29/2009 |
P09-36 |
Re-Issue of P05-05 - Use of Magnets near Remote Control Operated Equipment |
10/01/2009 |
P09-33 |
Effects of PVC Cement Vapors on Handheld Gas Detectors |
09/24/2009 |
P09-14 |
Re-Issue P06-01 - Compliance with the Testing and Maintenance Requirements of 30 C.F.R. 75.1911(i), Fire Suppression Systems for Diesel-Powered Equipment and Fuel Transportation Units |
07/17/2009 |
P09-13 |
Re-Issue P04-06 - Hazards Associated with Surface Mines Intersecting Abandoned or Underground Workings |
07/17/2009 |
P09-10 |
Re-Issue of P00-11 - Nondestructive Testing of Wire Rope –Electromagnetic Testing |
06/05/2009 |
P09-09 |
Re-Issue P07-04 - Clarification of Requirements of Title 30 Code of Federal Regulations § 57.11050 Escapeways and refuges |
06/04/2009 |
P09-08 |
Methane Ignitions at Surface Highwall Auger Operations |
05/22/2009 |
PIB Number | Title | Issue Date |
---|---|---|
P08-20 |
Surface Drilled Coalbed Methane Wells with Horizontal Branches in the Coal Seam |
08/27/2008 |
P08-19 |
Re-Issue of P01-4 - Hoist Examination and Safety Test Requirements |
08/27/2008 |
PIB Number | Title | Issue Date |
---|---|---|
P06-13 |
Common Air Courses and Examinations |
06/16/2006 |
PIB Number | Title | Issue Date |
---|---|---|
P04-13 |
Superseding of Program Information Bulletins P99-24 and P02-9 Regarding MSHA Approved Cable Splice Kits |
04/28/2004 |